IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,519

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0208 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $837 $818 Implemented
AM0113 # 01 Y:1991 01 1991 USE UTILITY CONTROLLED POWER MANAGEMENT $687,000 $250,000 Implemented
AM0113 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,390 $88,900 Implemented
AM0113 # 03 Y:1991 03 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,300 $280 Implemented
AM0113 # 04 Y:1991 04 1991 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $2,815 $400 Implemented
AM0113 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $340 $290 Implemented
UD0333 # 01 Y:1991 01 1991 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,221 $6,000 Implemented
UD0333 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $145,812 $0 Implemented
UD0333 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,976 $0 Implemented
UD0333 # 04 Y:1991 04 1991 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $34,857 $0 Implemented
OK0331 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,171 $0 Implemented
OK0331 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $382 $252 Implemented
OK0331 # 04 Y:1990 04 1990 INSTALL TIMERS AND/OR THERMOSTATS $108 $150 Implemented
MA0195 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $10,203 $1,196 Implemented
MA0195 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,675 $0 Implemented
MA0195 # 06 Y:1990 06 1990 INSTALL SET-BACK TIMERS $4,808 $1,521 Implemented
MA0195 # 08 Y:1990 08 1990 INSULATE BARE EQUIPMENT $462 $631 Implemented
MA0198 # 04 Y:1990 04 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $58,450 $102,564 Implemented
KU0325 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,200 $3,078 Implemented
KU0325 # 03 Y:1990 03 1990 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $391 $466 Implemented
KU0325 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $675 $1,416 Implemented
KU0325 # 06 Y:1990 06 1990 REDUCE VENTILATION AIR $8,297 $11,700 Implemented
KU0325 # 07 Y:1990 07 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $50,733 $0 Implemented
MA0190 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,902 $800 Implemented
MA0190 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $540 $0 Implemented