IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,519

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0209 # 14 Y:1986 14 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $736 $50 Implemented
KU0209 # 15 Y:1986 15 1986 INSTALL TURBULATORS $392 $2,500 Implemented
KU0209 # 16 Y:1986 16 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $353 $50 Implemented
KU0209 # 17 Y:1986 17 1986 USE COMPRESSOR AIR FILTERS $161 $50 Implemented
KU0209 # 18 Y:1986 18 1986 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $135 $0 Implemented
UD0213 # 01 Y:1987 01 1987 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,229 $20,000 Implemented
UD0213 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,000 $10,000 Implemented
UD0213 # 04 Y:1987 04 1987 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,036 $2,000 Implemented
UD0213 # 05 Y:1987 05 1987 RECOVER WASTE HEAT FROM EQUIPMENT $6,181 $15,000 Implemented
UD0214 # 02 Y:1987 02 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,230 $800 Implemented
UD0214 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,924 $910 Implemented
ST0080 # 02 Y:1986 02 1986 RECOVER WASTE HEAT FROM EQUIPMENT $9,482 $7,000 Implemented
ST0080 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,370 $0 Implemented
ST0080 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $531 $1,333 Implemented
ST0080 # 05 Y:1986 05 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,206 $558 Implemented
ST0080 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,264 $2,016 Implemented
UD0210 # 01 Y:1986 01 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $23,091 $20,000 Implemented
UD0210 # 02 Y:1986 02 1986 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $4,025 $1,250 Implemented
UD0210 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $870 $300 Implemented
UD0210 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,111 $1,000 Implemented
UD0210 # 06 Y:1986 06 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,670 $10,000 Implemented
UD0210 # 07 Y:1986 07 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $8,336 $18,000 Implemented
UD0210 # 08 Y:1986 08 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,244 $10,000 Implemented
AT0045 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,281 $4,444 Implemented
AT0045 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $2,194 $100 Implemented