IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,364

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0721 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $2,714 $345 Not Implemented
UD0721 # 08 Y:2005 08 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,229 $860 Not Implemented
UD0721 # 09 Y:2005 09 2005 INSULATE BARE EQUIPMENT $675 $1,820 Not Implemented
UD0721 # 10 Y:2005 10 2005 UPGRADE CONTROLS ON COMPRESSORS $614 $0 Not Implemented
UD0721 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $613 $420 Not Implemented
UD0721 # 12 Y:2005 12 2005 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $560 $1,000 Not Implemented
UD0721 # 13 Y:2005 13 2005 USE RADIANT HEATER FOR SPOT HEATING $506 $1,897 Not Implemented
NC0315 # 01 Y:2005 01 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $25,232 $100,000 Implemented
NC0315 # 02 Y:2005 02 2005 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $12,466 $45,000 Implemented
NC0315 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,799 $10,000 Implemented
NC0315 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,731 $0 Implemented
NC0315 # 05 Y:2005 05 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $535 $0 Implemented
NC0315 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $498 $100 Implemented
LE0214 # 01 Y:2005 01 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,742 $30,000 Not Implemented
LE0214 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,637 $5,500 Implemented
LE0214 # 03 Y:2005 03 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,017 $320 Implemented
LE0214 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,291 $640 Not Implemented
LE0214 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $3,259 $2,300 Implemented
LE0214 # 06 Y:2005 06 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,575 $500 Implemented
WI0493 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,163 $49,680 Not Implemented
WI0493 # 02 Y:2005 02 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $26,534 $11,200 Not Implemented
WI0493 # 03 Y:2005 03 2005 CONTRACT A WOOD PALLET RECYCLING COMPANY $22,020 $0 Not Implemented
WI0493 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,731 $1,920 Not Implemented
WI0493 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,287 $1,300 Not Implemented
WI0493 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,969 $2,000 Not Implemented