IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0052 # 05 Y:1993 05 1993 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,393 $100 Not Implemented
HO0052 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $2,891 $1,300 Not Implemented
HO0050 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,748 $2,605 Implemented
HO0050 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,764 $3,483 Implemented
HO0050 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $319 $285 Implemented
HO0050 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $809 $300 Implemented
HO0050 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $67 $204 Implemented
HO0050 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $834 $40 Implemented
ND0168 # 01 Y:1993 01 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,540 $2,800 n/a
ND0168 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,188 $200 n/a
ND0168 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $261 $283 n/a
ND0168 # 04 Y:1993 04 1993 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $354 $450 n/a
ND0168 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $172 $46 n/a
ND0168 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $197 $350 n/a
KU0402 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $29,764 $80,000 Not Implemented
KU0402 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $4,617 $3,517 Implemented
KU0402 # 03 Y:1993 03 1993 INSTALL SET-BACK TIMERS $3,940 $1,000 Implemented
KU0402 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $377 $200 Not Implemented
KU0402 # 05 Y:1993 05 1993 OPERATE BOILERS ON HIGH FIRE SETTING $3,802 $12,100 Not Implemented
KU0402 # 06 Y:1993 06 1993 USE SYNTHETIC LUBRICANT $3,674 $0 Not Implemented
KU0402 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,493 $11,200 Not Implemented
KU0402 # 08 Y:1993 08 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,395 $378 Not Implemented
KU0402 # 09 Y:1993 09 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,445 $9,310 Not Implemented
KU0402 # 10 Y:1993 10 1993 INSTALL TIMERS AND/OR THERMOSTATS $643 $440 Not Implemented
WV0011 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $2,345 $2,613 Not Implemented