IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0370 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $943 $243 Implemented
TN0370 # 07 Y:1989 07 1989 INSULATE BARE EQUIPMENT $2,374 $624 Not Implemented
TN0370 # 08 Y:1989 08 1989 IMPROVE LUBRICATION PRACTICES $456 $0 Implemented
TN0370 # 09 Y:1989 09 1989 REDUCE VENTILATION AIR $118 $173 Not Implemented
TN0370 # 10 Y:1989 10 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,402 $15,000 Not Implemented
KU0276 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $757 $1,432 Not Implemented
KU0276 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $658 $150 Implemented
KU0276 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $243 $133 Implemented
KU0276 # 04 Y:1989 04 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,066 $22,000 Not Implemented
KU0276 # 05 Y:1989 05 1989 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $460 $400 Not Implemented
RU0047 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,402 $441 Implemented
RU0047 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,029 $0 Implemented
RU0047 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,097 $9,000 Not Implemented
RU0047 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $557 $400 Not Implemented
RU0047 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,670 $594 Implemented
RU0047 # 06 Y:1989 06 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,506 $0 Implemented
RU0047 # 07 Y:1989 07 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,869 $0 Implemented
RU0047 # 08 Y:1989 08 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,848 $0 Not Implemented
OK0274 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $544 $350 Implemented
OK0274 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $6,510 $1,958 Not Implemented
OK0274 # 03 Y:1989 03 1989 INSULATE BARE EQUIPMENT $23,241 $3,556 Implemented
OK0274 # 04 Y:1989 04 1989 COVER OPEN TANKS $11,365 $1,986 Not Implemented
OK0274 # 05 Y:1989 05 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,511 $15,480 Not Implemented
OK0274 # 06 Y:1989 06 1989 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,113 $1,925 Implemented
OK0274 # 07 Y:1989 07 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,496 $6,200 Not Implemented