IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,344

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TS0030 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $50,700 $500 Not Implemented
TS0030 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,867 $2,550 Not Implemented
TS0030 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,867 $100 Not Implemented
TS0030 # 04 Y:1985 04 1985 AIR CONDITION ONLY SPACE NECESSARY $3,209 $75 Not Implemented
OK0173 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $239 $600 Not Implemented
OK0173 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,065 $3,248 Not Implemented
MA0028 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,972 $18,343 Not Implemented
MA0028 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,990 $3,525 Not Implemented
MA0028 # 03 Y:1985 03 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $218 $262 Not Implemented
MA0028 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,497 $94 Implemented
MA0028 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $606 $209 Not Implemented
MA0030 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,013 $1,515 Implemented
MA0030 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,095 $1,536 Implemented
MA0030 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $135 $214 Implemented
MA0030 # 04 Y:1985 04 1985 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $10,416 $8,764 Implemented
MA0030 # 05 Y:1985 05 1985 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,923 $15,106 Not Implemented
ST0026 # 01 Y:1985 01 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $292 $60 Not Implemented
ST0026 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,867 $40 Not Implemented
ST0026 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $607 $0 Not Implemented
ST0026 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $706 $1,700 Not Implemented
ST0026 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $29,188 $16,200 Not Implemented
ST0026 # 06 Y:1985 06 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $6,181 $0 Not Implemented
ST0026 # 07 Y:1985 07 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,096 $400 Not Implemented
ST0026 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $712 $537 Not Implemented
ST0026 # 09 Y:1985 09 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,391 $682 Not Implemented