IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,064

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0007 # 08 Y:1991 08 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61 $78 Implemented
UD0337 # 01 Y:1991 01 1991 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $69,034 $0 Not Implemented
UD0337 # 02 Y:1991 02 1991 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $37,108 $90,000 Not Implemented
UD0337 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $3,239 $2,700 Not Implemented
UD0337 # 04 Y:1991 04 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,619 $0 Not Implemented
UD0337 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $1,077 $0 Not Implemented
UD0337 # 06 Y:1991 06 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $45,840 $0 Not Implemented
UD0333 # 01 Y:1991 01 1991 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,221 $6,000 Implemented
UD0333 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $145,812 $0 Implemented
UD0333 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,976 $0 Implemented
UD0333 # 04 Y:1991 04 1991 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $34,857 $0 Implemented
TN0408 # 01 Y:1990 01 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $52,799 $3,900 Implemented
TN0408 # 02 Y:1990 02 1990 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $446,132 $265,300 Not Implemented
TN0408 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $52,799 $0 Implemented
TN0408 # 04 Y:1990 04 1990 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $36,453 $12,800 Implemented
WI0094 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,067 $3,222 Not Implemented
WI0094 # 02 Y:1990 02 1990 INSTALL STORM WINDOWS AND DOORS $3,800 $8,566 Not Implemented
WI0094 # 03 Y:1990 03 1990 INSTALL SET-BACK TIMERS $2,284 $1,000 Implemented
WI0094 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $975 $500 Implemented
WI0094 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $505 $0 Implemented
WI0094 # 06 Y:1990 06 1990 RECOVER WASTE HEAT FROM EQUIPMENT $489 $1,500 Not Implemented
WI0094 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $219 $800 Implemented
WI0094 # 08 Y:1990 08 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $508 $700 Not Implemented
TN0386 # 01 Y:1989 01 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,995 $9,500 Implemented
TN0386 # 02 Y:1989 02 1989 REDESIGN PROCESS $16,823 $3,380 Not Implemented