IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

561

matching recommendations
Reset
SIC 3312 Blast Furnaces And Steel Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0808 # 21 Y:2009 21 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,836 $0 Implemented
UD0808 # 22 Y:2009 22 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,305 $18,884 Not Implemented
UD0808 # 23 Y:2009 23 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,412 $5,050 Not Implemented
UD0808 # 24 Y:2009 24 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $2,053 $0 Not Implemented
UD0808 # 25 Y:2009 25 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,670 $0 Not Implemented
LE0283 # 01 Y:2009 01 2009 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $48,061 $100,000 Not Implemented
LE0283 # 02 Y:2009 02 2009 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $46,426 $38,000 Implemented
LE0283 # 03 Y:2009 03 2009 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $38,523 $560 Implemented
LE0283 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,658 $1,672 Implemented
LE0283 # 05 Y:2009 05 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $28,610 $12,000 Not Implemented
LE0283 # 06 Y:2009 06 2009 REPAIR OR REPLACE STEAM TRAPS $27,445 $10,500 Not Implemented
LE0283 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,225 $30,000 Not Implemented
LE0283 # 08 Y:2009 08 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $21,508 $30,000 Not Implemented
LE0283 # 09 Y:2009 09 2009 USE RADIANT HEATER FOR SPOT HEATING $19,446 $5,000 Not Implemented
LE0283 # 10 Y:2009 10 2009 REPLACE BOILER $19,000 $30,000 Not Implemented
LE0283 # 11 Y:2009 11 2009 PREHEAT COMBUSTION AIR WITH WASTE HEAT $18,031 $30,000 Implemented
LE0283 # 12 Y:2009 12 2009 COVER OPEN TANKS $9,339 $10,000 Implemented
LE0283 # 13 Y:2009 13 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,598 $2,400 Not Implemented
LE0283 # 14 Y:2009 14 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,947 $7,000 Not Implemented
LE0283 # 15 Y:2009 15 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,465 $160 Not Implemented
LE0283 # 16 Y:2009 16 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,319 $800 Not Implemented
LE0283 # 17 Y:2009 17 2009 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,129 $600 Not Implemented
LE0283 # 18 Y:2009 18 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $1,121 $1,000 Not Implemented
LE0283 # 19 Y:2009 19 2009 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $1,040 $600 Not Implemented
LE0283 # 20 Y:2009 20 2009 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $718 $300 Not Implemented