IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

561

matching recommendations
Reset
SIC 3312 Blast Furnaces And Steel Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0365 # 02 Y:2010 02 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $15,991 $107,000 Implemented
UM0365 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,966 $13,000 Implemented
UM0365 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $1,051 $0 Implemented
UM0365 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $43,773 $13,000 Implemented
UM0365 # 06 Y:2010 06 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,455 $3,500 Implemented
UM0365 # 07 Y:2010 07 2010 USE OPTIMUM THICKNESS INSULATION $1,040 $22,500 Implemented
UM0365 # 08 Y:2010 08 2010 INSTALL STORM WINDOWS AND DOORS $819 $0 Not Implemented
MS0350 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,943 $1,610 Not Implemented
MS0350 # 02 Y:2010 02 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,024 $3,640 Implemented
MS0350 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,808 $380 Implemented
IC0169 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,717 $6,357 Not Implemented
IC0169 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,298 $1,317 Not Implemented
IC0169 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $863 $71 Not Implemented
IC0169 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $127 $99 Not Implemented
IC0169 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,393 $5,249 Not Implemented
IC0169 # 06 Y:2010 06 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,108 $1,339 Not Implemented
IC0169 # 07 Y:2010 07 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $538 $0 Not Implemented
IC0169 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,189 $1,632 Not Implemented
IC0169 # 09 Y:2010 09 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,975 $4,551 Not Implemented
IC0169 # 10 Y:2010 10 2010 USE RADIANT HEATER FOR SPOT HEATING $28,097 $1,670 Not Implemented
IC0169 # 11 Y:2010 11 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $318 $613 Not Implemented
IC0169 # 12 Y:2010 12 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,403 $2,401 Not Implemented
IC0169 # 13 Y:2010 13 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,074 $1,265 Not Implemented
IC0169 # 14 Y:2010 14 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $124 $600 Not Implemented
IC0169 # 15 Y:2010 15 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $245 $0 Not Implemented