IAC Assessment: UD0817
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0817
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2010
Principal Product Continuous Steel Strip
NAICS 331221 - Rolled Steel Shape Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 70,000
Annual Production 5,600,000 Pounds
Production Hrs. Annual 2,736
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $416,254 9,975,253 kWh $0.04
Electricity Demand $301,426 21,900 kW-months/year $13.76
Natural Gas $248,139 22,766 MMBtu $10.90
TOTAL ENERGY COSTS $970,592
RECOMMENDED SAVINGS* $592,690 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $112,832
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$66,672
Cost:
$600
- - - - $66,672 - - - - - -
-
kWh
-
-
kW-months/year
$66,672
-
$
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$63,586
Cost:
$41,250
- - - - $63,586 - - - - - -
-
kWh
-
-
kW-months/year
$63,586
-
$
-
-
MMBtu
-
-
$
03: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$9,387
Cost:
-
- - - - $9,387 - - - - - -
-
kWh
-
-
kW-months/year
$9,387
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,364
Cost:
$1,876
$5,895 128,154 $2,974 21 - - - - $495 - $5,895
128,154
kWh
$2,974
21
kW-months/year
-
-
$
-
-
MMBtu
$495
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,546
Cost:
$3,000
$5,705 124,017 $4,908 34 - - - - $(-67) - $5,705
124,017
kWh
$4,908
34
kW-months/year
-
-
$
-
-
MMBtu
$(-67)
-
$
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,712
Cost:
$7,628
$1,712 37,210 - - - - - - - - $1,712
37,210
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$628
Cost:
-
$628 13,650 - - - - - - - - $628
13,650
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,696
Cost:
$2,250
$4,696 102,108 - - - - - - - - $4,696
102,108
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,120
Cost:
-
$1,542 33,527 $553 4 - - - - $(-975) - $1,542
33,527
kWh
$553
4
kW-months/year
-
-
$
-
-
MMBtu
$(-975)
-
$
10: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,001
Cost:
$2,366
$3,001 65,230 - - - - - - - - $3,001
65,230
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$8,137
Cost:
-
$8,137 176,904 - - - - - - - - $8,137
176,904
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
12: 2.2514 COVER OPEN TANKS Savings:
$10,386
Cost:
-
$11,686 254,040 - - - - - - $(-1,300) - $11,686
254,040
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-1,300)
-
$
13: 2.2511 INSULATE BARE EQUIPMENT Savings:
$21,893
Cost:
-
$16,118 350,400 $5,775 40 - - - - - - $16,118
350,400
kWh
$5,775
40
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
14: 2.1117 RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION Savings:
$300
Cost:
$50
- - - - - - $300 28 - - -
-
kWh
-
-
kW-months/year
-
-
$
$300
28
MMBtu
-
-
$
15: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,996
Cost:
-
$1,054 63,948 $2,942 7 - - - - - - $1,054
63,948
kWh
$2,942
7
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
16: 2.5194 REDESIGN PROCESS Savings:
$357,330
Cost:
-
$59,748 1,298,880 $7,940 220 - - $(-15,358) (-1,409) $305,000 - $59,748
1,298,880
kWh
$7,940
220
kW-months/year
-
-
$
$(-15,358)
(-1,409)
MMBtu
$305,000
-
$
17: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$18,312
Cost:
$36,624
- - - - - - $18,312 1,680 - - -
-
kWh
-
-
kW-months/year
-
-
$
$18,312
1,680
MMBtu
-
-
$
18: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,624
Cost:
$5,686
- - - - - - $1,624 149 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,624
149
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$592,690
Cost:
$101,330
$119,922 2,648,068 $25,092 326 $139,645 - $4,878 448 $303,153 - $119,922
2,648,068
kWh
$25,092
326
kW-months/year
$139,645
-
$
$4,878
448
MMBtu
$303,153
-
$
TOTAL IMPLEMENTED Savings:
$112,832
Cost:
$600
$39,165 892,469 $9,270 51 $66,672 - - - $(-2,275) - $39,165
892,469
kWh
$9,270
51
kW-months/year
$66,672
-
$
-
-
MMBtu
$(-2,275)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes