IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3317 Steel Pipe And Tubes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT8364 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,257 $9,840 n/a
LT8364 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,106 $26,500 n/a
LT8364 # 01 Y:2023 01 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $54,602 $0 n/a
AR0058 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,114 $150 Implemented
AR0058 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,459 $1,000 Implemented
AR0058 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,641 $4,433 Implemented
AR0058 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,949 $6,510 Implemented
AR0058 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,109 $0 Implemented
AR0058 # 05 Y:1995 05 1995 OPTIMIZE PLANT POWER FACTOR $4,705 $14,960 Not Implemented
LT0091 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $514 $159 Implemented
LT0091 # 07 Y:1987 07 1987 MINIMIZE WATER USAGE $1,400 $150 Not Implemented
LT0091 # 06 Y:1987 06 1987 REDESIGN PROCESS $15,700 $2,000 Implemented
LT0091 # 05 Y:1987 05 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,000 $10,000 Implemented
LT0091 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,584 $1,908 Implemented
LT0091 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $140 $270 Not Implemented
LT0091 # 01 Y:1987 01 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $506 $664 Implemented
LT0082 # 06 Y:1987 06 1987 COVER OPEN TANKS $23,100 $10,000 Implemented
LT0082 # 05 Y:1987 05 1987 COVER OPEN TANKS $11,400 $6,000 Not Implemented
LT0082 # 04 Y:1987 04 1987 COVER OPEN TANKS $12,200 $308 Not Implemented
LT0082 # 03 Y:1987 03 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $339 $96 Implemented
LT0082 # 02 Y:1987 02 1987 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,690 $0 Implemented
LT0082 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $960 $189 Implemented