IAC logo
IAC Assessment: LT0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LT0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Louisiana Tech
Assessment Year 1987
Principal Product FENCE TUBING
NAICS n/a
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 20,000 Tons
Production Hrs. Annual 6,728
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $354,146 6,219,519 kWh $0.06
Natural Gas $130,287 31,157 MMBtu $4.18
TOTAL ENERGY COSTS $484,433
RECOMMENDED SAVINGS* $38,844 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,304
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$506
Cost:
$664
$506 9,672 - - - - $506
9,672
kWh
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$514
Cost:
$159
- - $514 123 - - -
-
kWh
$514
123
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$140
Cost:
$270
$140 3,810 - - - - $140
3,810
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,584
Cost:
$1,908
$1,584 30,481 - - - - $1,584
30,481
kWh
-
-
MMBtu
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$19,000
Cost:
$10,000
- - $19,000 4,560 - - -
-
kWh
$19,000
4,560
MMBtu
-
-
$
06: 2.5194 REDESIGN PROCESS Savings:
$15,700
Cost:
$2,000
- - $15,700 3,760 - - -
-
kWh
$15,700
3,760
MMBtu
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$1,400
Cost:
$150
- - - - $1,400 - -
-
kWh
-
-
MMBtu
$1,400
-
$
TOTAL RECOMMENDED Savings:
$38,844
Cost:
$15,151
$2,230 43,963 $35,214 8,443 $1,400 - $2,230
43,963
kWh
$35,214
8,443
MMBtu
$1,400
-
$
TOTAL IMPLEMENTED Savings:
$37,304
Cost:
$14,731
$2,090 40,153 $35,214 8,443 - - $2,090
40,153
kWh
$35,214
8,443
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes