Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,149
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1142 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,322 | $0 | n/a |
OK1142 # 06 Y:2025 | 06 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $401 | $0 | n/a |
OK1142 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,244 | $80 | n/a |
OK1142 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $6,818 | $1,869 | n/a |
OK1142 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,888 | $1,688 | n/a |
WM0245 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $92,428 | $550,000 | n/a |
WM0245 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $65,152 | $0 | n/a |
WM0245 # 03 Y:2025 | 03 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $13,265 | $4,125 | n/a |
WM0245 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,572 | $2,170 | n/a |
UC2504 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $223,326 | $1,974,272 | n/a |
UC2504 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,622 | $1,600 | n/a |
UC2504 # 02 Y:2024 | 02 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $33,264 | $60 | n/a |
UC2504 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,212 | $2,686 | n/a |
UC2504 # 04 Y:2024 | 04 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $21,015 | $1,166 | n/a |
UC2504 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $19,657 | $60 | n/a |
UC2504 # 06 Y:2024 | 06 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $8,677 | $0 | n/a |
UA0295 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,442 | $4,771 | n/a |
UA0295 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $62,000 | $8,591 | n/a |
UA0295 # 03 Y:2025 | 03 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $85,871 | $42,000 | n/a |
UA0295 # 06 Y:2025 | 06 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $6,661 | $23,010 | n/a |
UA0295 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $36,113 | $1,750 | n/a |
UA0295 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $454 | $2,418 | n/a |
LE0596 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $7,008 | $2,000 | n/a |
LE0596 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $702 | $660 | n/a |
LE0596 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,044 | $45,000 | n/a |