Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0173 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $3,506 | $800 | Not Implemented |
UM0173 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $225 | Not Implemented |
UM0173 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,300 | $750 | Not Implemented |
UM0173 # 03 Y:2000 | 03 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $758 | $700 | Not Implemented |
UM0173 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $573 | $800 | Not Implemented |
UM0169 # 07 Y:2000 | 07 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,084 | $350 | Not Implemented |
UM0169 # 06 Y:2000 | 06 | 2000 | USE RADIANT HEATER FOR SPOT HEATING | $8,102 | $10,000 | Implemented |
UM0169 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,117 | $500 | Implemented |
UM0169 # 04 Y:2000 | 04 | 2000 | INSULATE BARE EQUIPMENT | $13,069 | $23,100 | Not Implemented |
UM0169 # 03 Y:2000 | 03 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $27,956 | $8,250 | Not Implemented |
UM0169 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $1,322 | $800 | Implemented |
UM0169 # 01 Y:2000 | 01 | 2000 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $15,444 | $2,250 | Implemented |
UM0169 # 08 Y:2000 | 08 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $50,433 | $23,500 | Implemented |
UM0169 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $312,500 | $860,000 | Not Implemented |
UM0168 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $526 | $993 | Implemented |
UM0168 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,117 | $50,000 | Not Implemented |
UM0168 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,945 | $2,250 | Implemented |
UM0168 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $8,180 | $300 | Implemented |
UM0168 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,403 | $1,400 | Not Implemented |
UM0168 # 06 Y:2000 | 06 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $293,452 | $1,020,000 | Not Implemented |
ND0346 # 13 Y:2000 | 13 | 2000 | INSTALL OCCUPANCY SENSORS | $330 | $400 | Not Implemented |
ND0346 # 12 Y:2000 | 12 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,827 | $320 | Implemented |
ND0346 # 11 Y:2000 | 11 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,834 | $7,999 | Not Implemented |
ND0346 # 06 Y:2000 | 06 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $38,499 | $40,000 | Not Implemented |
ND0346 # 05 Y:2000 | 05 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,004 | $50 | Implemented |