Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 332 Iron And Steel Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0741 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,308 $2,775 Not Implemented
MA0741 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,279 $7,050 Not Implemented
MA0741 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,147 $29,732 Not Implemented
MA0741 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,787 $14,025 Not Implemented
MA0741 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $91,436 $5,000 Not Implemented
MA0741 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $131,224 $279,750 Not Implemented
MA0553 # 02 Y:2004 02 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,555 $15,605 Implemented
MA0553 # 07 Y:2004 07 2004 INSULATE FEEDWATER TANK $910 $550 Implemented
MA0553 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,228 $600 Implemented
MA0553 # 05 Y:2004 05 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,918 $1,039 Not Implemented
MA0553 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,977 $12,543 Implemented
MA0553 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,980 $9,830 Not Implemented
MA0553 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,580 $20,000 Not Implemented
MA0348 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $127 Implemented
MA0348 # 06 Y:1995 06 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,710 $385 Not Implemented
MA0348 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $4,750 Implemented
MA0348 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,014 $1,200 Implemented
MA0348 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $642 $350 Not Implemented
MA0348 # 02 Y:1995 02 1995 USE SYNTHETIC LUBRICANT $852 $300 Not Implemented
MA0232 # 05 Y:1992 05 1992 INCREASE AMOUNT OF CONDENSATE RETURNED $884 $150 Implemented
MA0232 # 04 Y:1992 04 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,067 $0 Implemented
MA0232 # 03 Y:1992 03 1992 REPAIR OR REPLACE STEAM TRAPS $2,293 $2 Implemented
MA0232 # 02 Y:1992 02 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $61,173 $70,000 Not Implemented
MA0232 # 01 Y:1992 01 1992 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $31,842 $90,600 Not Implemented