Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsSIC | 332 | Iron And Steel Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1037 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,155 | $4,128 | Implemented |
OK1037 # 03 Y:2021 | 03 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $587 | $955 | Not Implemented |
OK1037 # 06 Y:2021 | 06 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $875 | $298 | Not Implemented |
OK1037 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,825 | $0 | Not Implemented |
OK1037 # 05 Y:2021 | 05 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $206 | $120 | Implemented |
OK1037 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,395 | $2,804 | Implemented |
OK1033 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,570 | $27,786 | Implemented |
OK1033 # 05 Y:2020 | 05 | 2020 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,056 | $671 | Not Implemented |
OK1033 # 03 Y:2020 | 03 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $262 | $700 | Implemented |
OK1033 # 04 Y:2020 | 04 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $343 | $0 | Not Implemented |
OK1033 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,433 | $2,100 | Implemented |
OK0881 # 10 Y:2014 | 10 | 2014 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $840 | $910 | Not Implemented |
OK0881 # 06 Y:2014 | 06 | 2014 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,894 | $7,100 | Implemented |
OK0881 # 04 Y:2014 | 04 | 2014 | USE COMPRESSOR AIR FILTERS | $721 | $112 | Implemented |
OK0881 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,989 | $700 | Implemented |
OK0881 # 12 Y:2014 | 12 | 2014 | INSTALL SET-BACK TIMERS | $6,977 | $3,900 | Not Implemented |
OK0881 # 14 Y:2014 | 14 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $381 | $1,728 | Not Implemented |
OK0881 # 09 Y:2014 | 09 | 2014 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $267 | $56 | Implemented |
OK0881 # 08 Y:2014 | 08 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,194 | $4,592 | Not Implemented |
OK0881 # 11 Y:2014 | 11 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $463 | $181 | Not Implemented |
OK0881 # 13 Y:2014 | 13 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,828 | $18,850 | Not Implemented |
OK0881 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $3,196 | $1,170 | Not Implemented |
OK0881 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $891 | $847 | Not Implemented |
OK0881 # 05 Y:2014 | 05 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,393 | $0 | Implemented |
OK0881 # 15 Y:2014 | 15 | 2014 | INSTALL EQUIPMENT TO MOVE PRODUCT | $88,525 | $492,000 | Implemented |