IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0252 # 06 Y:2021 06 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,974 $1,100 Not Implemented
TT0252 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,034 $59,439 Implemented
TT0252 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,938 $40 Implemented
TT0252 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,906 $150 Implemented
TT0252 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,977 $21,240 Not Implemented
TT0252 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $12,310 $29,594 Not Implemented
TT0252 # 07 Y:2021 07 2021 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,300 $2,500 Not Implemented
IC0206 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,708 $1,690 Not Implemented
IC0206 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,299 $2,713 Not Implemented
IC0206 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $244 $191 Not Implemented
IC0206 # 03 Y:2018 03 2018 USE RADIANT HEATER FOR SPOT HEATING $2,158 $3,396 Not Implemented
IC0206 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,289 $750 Not Implemented
IC0206 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,280 $290 Not Implemented
BD0484 # 10 Y:2016 10 2016 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,780 $2,050 n/a
BD0484 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $3,829 $2,400 n/a
BD0484 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,651 $60 n/a
BD0484 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,061 $674 n/a
BD0484 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,174 $620 n/a
BD0484 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,253 $19,236 n/a
BD0484 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,986 $2,268 n/a
BD0484 # 02 Y:2016 02 2016 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $12,305 $4,540 n/a
BD0484 # 03 Y:2016 03 2016 USE RADIANT HEATER FOR SPOT HEATING $10,396 $23,100 n/a
BD0484 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $13,713 $3,180 n/a
BD0398 # 05 Y:2011 05 2011 USE SYNTHETIC LUBRICANT $2,370 $300 Not Implemented
BD0398 # 02 Y:2011 02 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,047 $6,500 Not Implemented