IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0282 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,739 $290 Not Implemented
IA0282 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $836 $25 Not Implemented
IA0282 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,095 $3,205 Implemented
IA0282 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,847 $0 Implemented
IA0282 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,255 $0 Implemented
IA0282 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $3,297 $1,111 Not Implemented
IA0282 # 08 Y:2001 08 2001 USE RADIANT HEATER FOR SPOT HEATING $6,750 $9,596 Implemented
IA0282 # 09 Y:2001 09 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $45,760 $58,400 n/a
IA0282 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $489 $174 Implemented
OK0623 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,052 $6,513 Implemented
OK0623 # 11 Y:2001 11 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,160 $4,300 Not Implemented
OK0623 # 02 Y:2001 02 2001 USE OPTIMUM THICKNESS INSULATION $8,776 $550 Implemented
OK0623 # 03 Y:2001 03 2001 INSTALL SET-BACK TIMERS $6,800 $1,035 Not Implemented
OK0623 # 04 Y:2001 04 2001 REPAIR AND ELIMINATE STEAM LEAKS $1,256 $200 Implemented
OK0623 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $614 $245 Not Implemented
OK0623 # 06 Y:2001 06 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,620 $21,240 Implemented
OK0623 # 07 Y:2001 07 2001 IMPROVE SPACE COMFORT CONDITIONING $25,723 $9,332 Not Implemented
OK0623 # 08 Y:2001 08 2001 INSTALL SET-BACK TIMERS $4,652 $4,500 Implemented
OK0623 # 09 Y:2001 09 2001 AUTOMATE FINISHING PROCESS $41,030 $150,000 Not Implemented
OK0623 # 10 Y:2001 10 2001 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $99,840 $57,120 Not Implemented
LE0116 # 06 Y:2001 06 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $113 $40 Implemented
LE0116 # 05 Y:2001 05 2001 USE LESS WASTEFUL PACKAGING $11,666 $0 Not Implemented
LE0116 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $668 $239 Implemented
LE0116 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,580 $0 Implemented
LE0116 # 02 Y:2001 02 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,073 $0 Implemented