IAC Assessment: OK0623
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0623
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2001
Principal Product Casting Parts
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $5,000,000-$10,000,000
# of Employees 180
Plant Area (Sq.Ft.) 180,000
Annual Production 62,400 Pieces
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,987 9,053,307 kWh $0.02
Electricity Demand $40,476 7,500 kW-months/year $5.40
Electricity Fees $1,349 - $ -
Natural Gas $158,260 26,056 MMBtu $6.07
TOTAL ENERGY COSTS $429,120
RECOMMENDED SAVINGS* $203,523 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,356
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,052
Cost:
$6,513
$882 33,280 $1,030 192 - - - - $140 - $882
33,280
kWh
$1,030
192
kW-months/year
-
-
MMBtu
-
-
$
$140
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$8,776
Cost:
$550
- - - - $8,776 1,296 - - - - -
-
kWh
-
-
kW-months/year
$8,776
1,296
MMBtu
-
-
$
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$6,800
Cost:
$1,035
- - - - $6,800 1,004 - - - - -
-
kWh
-
-
kW-months/year
$6,800
1,004
MMBtu
-
-
$
-
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,256
Cost:
$200
$600 24,500 $756 144 - - $(-100) - - - $600
24,500
kWh
$756
144
kW-months/year
-
-
MMBtu
$(-100)
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$614
Cost:
$245
$64 2,628 $19 4 - - $120 - $411 - $64
2,628
kWh
$19
4
kW-months/year
-
-
MMBtu
$120
-
$
$411
-
$
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$8,620
Cost:
$21,240
- - - - $8,620 1,273 - - - - -
-
kWh
-
-
kW-months/year
$8,620
1,273
MMBtu
-
-
$
-
-
$
07: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$25,723
Cost:
$9,332
- - - - - - $25,723 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,723
-
$
-
-
$
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,652
Cost:
$4,500
- - - - $4,652 687 - - - - -
-
kWh
-
-
kW-months/year
$4,652
687
MMBtu
-
-
$
-
-
$
09: 4.446 AUTOMATE FINISHING PROCESS Savings:
$41,030
Cost:
$150,000
$(-570) (-23,275) - - - - $41,600 - - - $(-570)
(-23,275)
kWh
-
-
kW-months/year
-
-
MMBtu
$41,600
-
$
-
-
$
10: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$99,840
Cost:
$57,120
- - - - - - $99,840 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$99,840
-
$
-
-
$
11: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,160
Cost:
$4,300
- - - - - - $4,160 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,160
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$203,523
Cost:
$255,035
$976 37,133 $1,805 340 $28,848 4,260 $171,343 - $551 - $976
37,133
kWh
$1,805
340
kW-months/year
$28,848
4,260
MMBtu
$171,343
-
$
$551
-
$
TOTAL IMPLEMENTED Savings:
$25,356
Cost:
$33,003
$1,482 57,780 $1,786 336 $22,048 3,256 $(-100) - $140 - $1,482
57,780
kWh
$1,786
336
kW-months/year
$22,048
3,256
MMBtu
$(-100)
-
$
$140
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost