IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0351 # 07 Y:2008 07 2008 MODIFY STARTUP/SHUTDOWN TIMES $84,567 $63,000 Not Implemented
BD0351 # 06 Y:2008 06 2008 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $9,722 $25,200 Not Implemented
BD0351 # 05 Y:2008 05 2008 USE RADIANT HEATER FOR SPOT HEATING $62,988 $47,700 Not Implemented
BD0351 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,907 $1,500 Not Implemented
BD0351 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $412 $425 Not Implemented
BD0351 # 02 Y:2008 02 2008 INSTALL OCCUPANCY SENSORS $2,088 $2,250 Not Implemented
BD0351 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,834 $48,839 Not Implemented
UA0025 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,007 $37,179 Not Implemented
UA0025 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,844 $1,500 Implemented
UA0025 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,469 $0 Not Implemented
UA0025 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $5,715 $3,500 Not Implemented
UA0025 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $43,433 $13,600 Not Implemented
UA0025 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,216 $7,928 Not Implemented
IA0432 # 09 Y:2008 09 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $571 $1,650 Implemented
IA0432 # 11 Y:2008 11 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,042 $930 Not Implemented
IA0432 # 10 Y:2008 10 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,529 $1,781 Not Implemented
IA0432 # 12 Y:2008 12 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,480 $5,333 Implemented
IA0432 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $687 $330 Implemented
IA0432 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,099 $1,884 Implemented
IA0432 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,859 $620 Implemented
IA0432 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $67 Not Implemented
IA0432 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $979 $17 Implemented
IA0432 # 07 Y:2008 07 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $423 $143 Implemented
IA0432 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $16,295 $3,442 Not Implemented
IA0432 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $322 Implemented