IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3321 Gray And Ductile Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0252 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,977 $21,240 Not Implemented
TT0252 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $12,310 $29,594 Not Implemented
TT0252 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,938 $40 Implemented
TT0252 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,034 $59,439 Implemented
TT0252 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,906 $150 Implemented
TT0252 # 06 Y:2021 06 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,974 $1,100 Not Implemented
TT0252 # 07 Y:2021 07 2021 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,300 $2,500 Not Implemented
UU0173 # 08 Y:2021 08 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $661 $600 Not Implemented
UU0173 # 07 Y:2021 07 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $683 $2,361 Not Implemented
UU0173 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,018 $474 Implemented
UU0173 # 05 Y:2021 05 2021 ADJUST BURNERS FOR EFFICIENT OPERATION $1,292 $1,300 Not Implemented
UU0173 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $1,355 $594 Not Implemented
UU0173 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,755 $8,095 Implemented
UU0173 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $5,743 $3,188 Implemented
UU0173 # 01 Y:2021 01 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,037 $2,000 Not Implemented
OK1037 # 06 Y:2021 06 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $875 $298 Not Implemented
OK1037 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $206 $120 Implemented
OK1037 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,155 $4,128 Implemented
OK1037 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $587 $955 Not Implemented
OK1037 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,825 $0 Not Implemented
OK1037 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,395 $2,804 Implemented