Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2021 |
Principal Product | Metal Cast Parts |
NAICS | 331511 - Iron Foundries |
SIC | 3321 - Gray And Ductile Iron Foundries |
Sales | $1,000,000-$5,000,000 |
# of Employees | 30 |
Plant Area (Sq.Ft.) | 57,000 |
Annual Production | 10,000 Pieces |
Production Hrs. Annual | 2,295 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $52,355 | 1,138,392 | kWh | $0.05 |
Electricity Demand | $181,633 | 13,268 | kW-months/year | $13.69 |
Electricity Fees | $586 | - | $ | - |
Natural Gas | $10,074 | 1,012 | MMBtu | $9.95 |
TOTAL ENERGY COSTS | $244,648 | |||
RECOMMENDED SAVINGS* | $29,543 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,516 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $15,037 Cost: $2,000 |
- | - | $15,037 | 1,083 | - | - |
- - kWh |
$15,037 1,083 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $5,743 Cost: $3,188 |
$5,743 | 124,885 | - | - | - | - |
$5,743 124,885 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,755 Cost: $8,095 |
$1,456 | 31,652 | $2,299 | 166 | - | - |
$1,456 31,652 kWh |
$2,299 166 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,355 Cost: $594 |
$688 | 14,973 | $667 | 48 | - | - |
$688 14,973 kWh |
$667 48 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $1,292 Cost: $1,300 |
- | - | - | - | $1,292 | 173 |
- - kWh |
- - kW-months/year |
$1,292 173 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,018 Cost: $474 |
$851 | 18,500 | $167 | 12 | - | - |
$851 18,500 kWh |
$167 12 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $683 Cost: $2,361 |
$683 | 14,847 | - | - | - | - |
$683 14,847 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $661 Cost: $600 |
$336 | 7,310 | $325 | 23 | - | - |
$336 7,310 kWh |
$325 23 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,543 Cost: $18,612 |
$9,757 | 212,167 | $18,495 | 1,331 | $1,292 | 173 | $9,757 212,167 kWh |
$18,495 1,331 kW-months/year |
$1,292 173 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,516 Cost: $11,757 |
$8,050 | 175,037 | $2,466 | 178 | - | - | $8,050 175,037 kWh |
$2,466 178 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |