Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 3325 Steel Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0120 # 01 Y:2017 01 2017 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $113,750 $5,600 Not Implemented
UU0120 # 09 Y:2017 09 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,929 $0 Implemented
UU0120 # 08 Y:2017 08 2017 OPTIMIZE PLANT POWER FACTOR $3,894 $3,500 Not Implemented
UU0120 # 07 Y:2017 07 2017 INSTALL COMMON HEADER ON COMPRESSORS $4,024 $5,000 Implemented
UU0120 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,227 $410 Implemented
UU0120 # 05 Y:2017 05 2017 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,334 $400 Implemented
UU0120 # 04 Y:2017 04 2017 UPGRADE CONTROLS ON COMPRESSORS $12,184 $800 Implemented
UU0120 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $32,948 $23,006 Not Implemented
UU0120 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,587 $61,481 Implemented
BS0078 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $174 $187 Not Implemented
BS0078 # 09 Y:2016 09 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $262 $89 Not Implemented
BS0078 # 08 Y:2016 08 2016 UPGRADE CONTROLS ON COMPRESSORS $5,829 $3,661 Not Implemented
BS0078 # 07 Y:2016 07 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,671 $827 Not Implemented
BS0078 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,178 $21,982 Not Implemented
BS0078 # 05 Y:2016 05 2016 DEVELOP STANDARD OPERATING PROCEDURES $22,270 $4,336 Not Implemented
BS0078 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,130 $11,073 Not Implemented
BS0078 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $415 $162 Not Implemented
BS0078 # 02 Y:2016 02 2016 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,270 $8,259 Not Implemented