IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 3325 Steel Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0238 # 07 Y:1987 07 1987 RECOVER WASTE HEAT FROM EQUIPMENT $3,369 $1,219 Not Implemented
OK0238 # 06 Y:1987 06 1987 USE OPTIMUM THICKNESS INSULATION $1,643 $6,000 Not Implemented
OK0238 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,923 $28,665 Not Implemented
OK0238 # 04 Y:1987 04 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,068 $2,500 Not Implemented
OK0238 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $17,160 $1,500 Not Implemented
OK0238 # 02 Y:1987 02 1987 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $964 $0 Not Implemented
OK0238 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $263 $105 Not Implemented
OK0230 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $331 $55 Implemented
OK0230 # 05 Y:1987 05 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,577 $4,125 Implemented
OK0230 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $105 $154 Not Implemented
OK0230 # 02 Y:1987 02 1987 INSULATE BARE EQUIPMENT $669 $1,450 Not Implemented
OK0230 # 01 Y:1987 01 1987 INSTALL TIMERS AND/OR THERMOSTATS $999 $0 Implemented
WI0002 # 06 Y:1987 06 1987 OPTIMIZE PLANT POWER FACTOR $5,773 $12,000 Implemented
WI0002 # 02 Y:1987 02 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,806 $0 Implemented
WI0002 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $3,998 Implemented
WI0002 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118 $168 Not Implemented
WI0002 # 05 Y:1987 05 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,543 $3,000 Not Implemented
GT0320 # 01 Y:1987 01 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $450 $300 Implemented
WI0002 # 01 Y:1987 01 1987 IMPROVE LUBRICATION PRACTICES $11,988 $3,268 Implemented
GT0320 # 06 Y:1987 06 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $155 $310 Implemented
GT0320 # 05 Y:1987 05 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $350 $520 Implemented
GT0320 # 04 Y:1987 04 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,400 $5,170 Implemented
GT0320 # 03 Y:1987 03 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,700 $28,500 Not Implemented
GT0320 # 02 Y:1987 02 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,900 $50,000 Implemented