Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 3325 | Steel Foundries, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0476 # 11 Y:2015 | 11 | 2015 | INSTALL OCCUPANCY SENSORS | $7,038 | $21,100 | Implemented |
SF0476 # 10 Y:2015 | 10 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,176 | $17,481 | Not Implemented |
SF0476 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $63,239 | $121,403 | Implemented |
SF0476 # 08 Y:2015 | 08 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,971 | $4,378 | Not Implemented |
SF0476 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,324 | $215 | Implemented |
SF0476 # 06 Y:2015 | 06 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,722 | $386 | Implemented |
SF0476 # 05 Y:2015 | 05 | 2015 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,486 | $722 | Not Implemented |
SF0476 # 04 Y:2015 | 04 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,163 | $913 | Implemented |
SF0476 # 03 Y:2015 | 03 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,817 | $0 | Implemented |
SF0476 # 02 Y:2015 | 02 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,100 | $280 | Implemented |
SF0476 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,871 | $0 | Implemented |
BS0065 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,088 | $160 | Implemented |
BS0065 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $148 | $15 | Implemented |
BS0065 # 02 Y:2015 | 02 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,215 | $10,715 | Not Implemented |
BS0065 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,229 | $46,340 | Implemented |
AM0682 # 01 Y:2015 | 01 | 2015 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $6,985 | $2,000 | Not Implemented |
AM0682 # 10 Y:2015 | 10 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $150 | $0 | Implemented |
AM0682 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $170 | $200 | Implemented |
AM0682 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $211 | $75 | Implemented |
AM0682 # 07 Y:2015 | 07 | 2015 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $430 | $0 | Not Implemented |
AM0682 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $585 | $5 | Implemented |
AM0682 # 05 Y:2015 | 05 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,840 | $1,790 | Implemented |
AM0682 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,295 | $7,280 | Not Implemented |
AM0682 # 03 Y:2015 | 03 | 2015 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $4,320 | $5,400 | Not Implemented |
AM0682 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,480 | $1,000 | Implemented |