Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,042
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0455 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,861 | $35,685 | n/a |
MI0455 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,287 | $1,620 | n/a |
MI0455 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,478 | $80 | n/a |
MI0455 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $24,930 | $3,200 | n/a |
MI0455 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $46,100 | $45,007 | n/a |
MI0455 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,323 | $1,578 | n/a |
UL2408 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,749 | $39,000 | n/a |
UL2408 # 01 Y:2024 | 01 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $77,905 | $42,617 | n/a |
UL2408 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $319,482 | $2,990,386 | n/a |
NT0026 # 05 Y:2024 | 05 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $133,205 | $0 | Not Implemented |
NT0026 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $109,656 | $54,987 | Implemented |
NT0026 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $122,072 | $90,330 | Not Implemented |
NT0026 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,160 | $5,609 | Implemented |
NT0026 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,341 | $0 | Implemented |
IP0188 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,671 | $49 | Not Implemented |
IP0188 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,293 | $2,560 | Not Implemented |
IP0188 # 06 Y:2024 | 06 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $8,621 | $438 | Not Implemented |
IP0188 # 09 Y:2024 | 09 | 2024 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $1,660 | $947 | Not Implemented |
IP0188 # 03 Y:2024 | 03 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $20,000 | $650 | Not Implemented |
IP0188 # 02 Y:2024 | 02 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $27,927 | $2,500 | Not Implemented |
IP0188 # 01 Y:2024 | 01 | 2024 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $191,070 | $2,400 | Not Implemented |
IP0188 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,737 | $750 | Not Implemented |
IP0188 # 08 Y:2024 | 08 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $4,200 | $5,429 | Not Implemented |
IP0184 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $83,429 | $20,365 | Implemented |
IP0184 # 01 Y:2023 | 01 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $14,493 | $0 | Implemented |