Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,042

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0455 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,861 $35,685 n/a
MI0455 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,287 $1,620 n/a
MI0455 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,478 $80 n/a
MI0455 # 02 Y:2024 02 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,930 $3,200 n/a
MI0455 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $46,100 $45,007 n/a
MI0455 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,323 $1,578 n/a
UL2408 # 03 Y:2024 03 2024 RECOVER WASTE HEAT FROM EQUIPMENT $40,749 $39,000 n/a
UL2408 # 01 Y:2024 01 2024 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $77,905 $42,617 n/a
UL2408 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $319,482 $2,990,386 n/a
NT0026 # 05 Y:2024 05 2024 APPLY FOR INVESTMENT INCENTIVES $133,205 $0 Not Implemented
NT0026 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $109,656 $54,987 Implemented
NT0026 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $122,072 $90,330 Not Implemented
NT0026 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,160 $5,609 Implemented
NT0026 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,341 $0 Implemented
IP0188 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,671 $49 Not Implemented
IP0188 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,293 $2,560 Not Implemented
IP0188 # 06 Y:2024 06 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,621 $438 Not Implemented
IP0188 # 09 Y:2024 09 2024 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $1,660 $947 Not Implemented
IP0188 # 03 Y:2024 03 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $20,000 $650 Not Implemented
IP0188 # 02 Y:2024 02 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $27,927 $2,500 Not Implemented
IP0188 # 01 Y:2024 01 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $191,070 $2,400 Not Implemented
IP0188 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,737 $750 Not Implemented
IP0188 # 08 Y:2024 08 2024 USE RADIANT HEATER FOR SPOT HEATING $4,200 $5,429 Not Implemented
IP0184 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $83,429 $20,365 Implemented
IP0184 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,493 $0 Implemented