Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
865
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0037 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $266 | $0 | Implemented |
ST0037 # 07 Y:1985 | 07 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $275 | $410 | Implemented |
ST0037 # 08 Y:1985 | 08 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,124 | $2,000 | Implemented |
ST0037 # 09 Y:1985 | 09 | 1985 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,039 | $0 | Implemented |
ST0037 # 12 Y:1985 | 12 | 1985 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $2,762 | $884 | Implemented |
LT0030 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,893 | $4,000 | Implemented |
MA0028 # 04 Y:1985 | 04 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,497 | $94 | Implemented |
GT0253 # 01 Y:1985 | 01 | 1985 | REPAIR AND ELIMINATE STEAM LEAKS | $3,190 | $900 | Implemented |
GT0253 # 02 Y:1985 | 02 | 1985 | INSTALL / REPAIR INSULATION ON STEAM LINES | $700 | $1,100 | Implemented |
GT0253 # 03 Y:1985 | 03 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,860 | $1,000 | Implemented |
GT0253 # 06 Y:1985 | 06 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $957 | $563 | Implemented |
ST0018 # 02 Y:1985 | 02 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $679 | $0 | Implemented |
ST0018 # 05 Y:1985 | 05 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,502 | $453 | Implemented |
ST0018 # 06 Y:1985 | 06 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,390 | $1,900 | Implemented |
ST0018 # 07 Y:1985 | 07 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,356 | $128 | Implemented |
ST0018 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,038 | $537 | Implemented |
ST0018 # 10 Y:1985 | 10 | 1985 | INSULATE BARE EQUIPMENT | $599 | $1,263 | Implemented |
ST0015 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $180 | $120 | Implemented |
ST0015 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,280 | $500 | Implemented |
ST0015 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $4,844 | $1,000 | Implemented |
ST0015 # 07 Y:1985 | 07 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $359 | $41 | Implemented |
ST0015 # 02 Y:1985 | 02 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $828 | $0 | Implemented |
KU0149 # 01 Y:1984 | 01 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $34,443 | $3,262 | Implemented |
KU0149 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $3,920 | $350 | Implemented |
KU0149 # 03 Y:1984 | 03 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $965 | $400 | Implemented |