IAC Assessment: ST0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ST0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Stevens Institute of Technology
Assessment Year 1985
Principal Product WIRE & CABLE PRODUCTS
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $1,000,000-$5,000,000
# of Employees 89
Plant Area (Sq.Ft.) 0
Annual Production 600,000 Pounds
Production Hrs. Annual 5,304
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $129,153 1,446,073 kWh $0.09
LPG $543 28 MMBtu $19.39
Fuel Oil #2 $34,886 4,732 MMBtu $7.37
TOTAL ENERGY COSTS $164,582
RECOMMENDED SAVINGS* $34,436 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,564
#|Description Savings
Cost
Status Electricity Usage Natural Gas LPG Fuel Oil #2 Electricity Usage Natural Gas LPG Fuel Oil #2
$ kWh $ MMBtu $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,967
Cost:
$2,258
$8,967 100,528 - - - - - - $8,967
100,528
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
02: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$679
Cost:
-
$450 4,982 - - $229 12 - - $450
4,982
kWh
-
-
MMBtu
$229
12
MMBtu
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$533
Cost:
$750
$824 9,086 $(-291) (-39) - - - - $824
9,086
kWh
$(-291)
(-39)
MMBtu
-
-
MMBtu
-
-
MMBtu
04: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$200
Cost:
$100
- - $(-114) (-16) $314 16 - - -
-
kWh
$(-114)
(-16)
MMBtu
$314
16
MMBtu
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,502
Cost:
$453
- - - - - - $1,502 204 -
-
kWh
-
-
MMBtu
-
-
MMBtu
$1,502
204
MMBtu
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,390
Cost:
$1,900
$6,390 - - - - - - - $6,390
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,356
Cost:
$128
$10,356 116,647 - - - - - - $10,356
116,647
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
08: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$2,670
Cost:
$1,350
- - - - - - $2,670 362 -
-
kWh
-
-
MMBtu
-
-
MMBtu
$2,670
362
MMBtu
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,038
Cost:
$537
- - - - - - $2,038 276 -
-
kWh
-
-
MMBtu
-
-
MMBtu
$2,038
276
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$599
Cost:
$1,263
- - - - - - $599 81 -
-
kWh
-
-
MMBtu
-
-
MMBtu
$599
81
MMBtu
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$502
Cost:
$100
$502 5,569 - - - - - - $502
5,569
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$34,436
Cost:
$8,839
$27,489 236,812 $(-405) (-55) $543 28 $6,809 923 $27,489
236,812
kWh
$(-405)
(-55)
MMBtu
$543
28
MMBtu
$6,809
923
MMBtu
TOTAL IMPLEMENTED Savings:
$21,564
Cost:
$4,281
$17,196 121,629 - - $229 12 $4,139 561 $17,196
121,629
kWh
-
-
MMBtu
$229
12
MMBtu
$4,139
561
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ MMBtu
Electricity Usage Natural Gas LPG Fuel Oil #2 Electricity Usage Natural Gas LPG Fuel Oil #2