Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Stevens Institute of Technology |
---|---|
Assessment Year | 1985 |
Principal Product | WIRE & CABLE PRODUCTS |
NAICS | n/a |
SIC | 3357 - Nonferrous Wiredrawing & Insulating |
Sales | $1,000,000-$5,000,000 |
# of Employees | 89 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 600,000 Pounds |
Production Hrs. Annual | 5,304 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $129,153 | 1,446,073 | kWh | $0.09 |
LPG | $543 | 28 | MMBtu | $19.39 |
Fuel Oil #2 | $34,886 | 4,732 | MMBtu | $7.37 |
TOTAL ENERGY COSTS | $164,582 | |||
RECOMMENDED SAVINGS* | $34,436 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,564 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | LPG | Fuel Oil #2 | Electricity Usage | Natural Gas | LPG | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,967 Cost: $2,258 |
$8,967 | 100,528 | - | - | - | - | - | - |
$8,967 100,528 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $679 Cost: - |
$450 | 4,982 | - | - | $229 | 12 | - | - |
$450 4,982 kWh |
- - MMBtu |
$229 12 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $533 Cost: $750 |
$824 | 9,086 | $(-291) | (-39) | - | - | - | - |
$824 9,086 kWh |
$(-291) (-39) MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS |
Savings: $200 Cost: $100 |
- | - | $(-114) | (-16) | $314 | 16 | - | - |
- - kWh |
$(-114) (-16) MMBtu |
$314 16 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,502 Cost: $453 |
- | - | - | - | - | - | $1,502 | 204 |
- - kWh |
- - MMBtu |
- - MMBtu |
$1,502 204 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER |
Savings: $6,390 Cost: $1,900 |
$6,390 | - | - | - | - | - | - | - |
$6,390 - kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,356 Cost: $128 |
$10,356 | 116,647 | - | - | - | - | - | - |
$10,356 116,647 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1123 INSTALL AUTOMATIC STACK DAMPER |
Savings: $2,670 Cost: $1,350 |
- | - | - | - | - | - | $2,670 | 362 |
- - kWh |
- - MMBtu |
- - MMBtu |
$2,670 362 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,038 Cost: $537 |
- | - | - | - | - | - | $2,038 | 276 |
- - kWh |
- - MMBtu |
- - MMBtu |
$2,038 276 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $599 Cost: $1,263 |
- | - | - | - | - | - | $599 | 81 |
- - kWh |
- - MMBtu |
- - MMBtu |
$599 81 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $502 Cost: $100 |
$502 | 5,569 | - | - | - | - | - | - |
$502 5,569 kWh |
- - MMBtu |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,436 Cost: $8,839 |
$27,489 | 236,812 | $(-405) | (-55) | $543 | 28 | $6,809 | 923 | $27,489 236,812 kWh |
$(-405) (-55) MMBtu |
$543 28 MMBtu |
$6,809 923 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,564 Cost: $4,281 |
$17,196 | 121,629 | - | - | $229 | 12 | $4,139 | 561 | $17,196 121,629 kWh |
- - MMBtu |
$229 12 MMBtu |
$4,139 561 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | LPG | Fuel Oil #2 | Electricity Usage | Natural Gas | LPG | Fuel Oil #2 |