IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0122 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $370 $75 Not Implemented
AS0122 # 06 Y:1994 06 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,540 $22,350 Not Implemented
AS0122 # 07 Y:1994 07 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,565 $5,200 Implemented
AS0122 # 08 Y:1994 08 1994 DISCONNECT BALLASTS $242 $200 Implemented
AS0122 # 09 Y:1994 09 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,874 $8,097 Not Implemented
AS0122 # 10 Y:1994 10 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314 $220 Implemented
AS0105 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $157 $12,760 Not Implemented
AS0105 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $75 $147 Implemented
AS0105 # 03 Y:1993 03 1993 INSTALL OCCUPANCY SENSORS $546 $900 Implemented
AS0105 # 04 Y:1993 04 1993 USE SYNTHETIC LUBRICANT $623 $1,230 Implemented
AS0105 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,244 $350 Implemented
AS0105 # 06 Y:1993 06 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,746 $0 Implemented
AS0105 # 07 Y:1993 07 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $551 $500 Not Implemented
AS0105 # 08 Y:1993 08 1993 INSULATE BARE EQUIPMENT $16,707 $2,040 Not Implemented
AS0105 # 09 Y:1993 09 1993 INSULATE BARE EQUIPMENT $1,707 $820 Implemented
AS0105 # 10 Y:1993 10 1993 COVER OPEN TANKS $5,556 $0 Implemented
AS0071 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,838 $28,119 Not Implemented
AS0071 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $762 $0 Not Implemented
AS0071 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,183 $4,100 Not Implemented
AS0071 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,487 $1,000 Not Implemented
AS0071 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,744 $2,500 Not Implemented
AS0071 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $15,532 $1,099 Not Implemented
AS0071 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,761 $5,217 Not Implemented
AS0071 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,921 $21,494 Not Implemented
AS0032 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,399 $8,199 Not Implemented