Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,036
matching recommendationsSIC | 335 | Nonferrous Rolling And Drawing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0302 # 08 Y:2002 | 08 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,091 | $0 | Not Implemented |
UF0302 # 09 Y:2002 | 09 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $20,631 | $15,352 | Not Implemented |
UF0302 # 10 Y:2002 | 10 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $111,281 | $400,000 | Not Implemented |
MI0033 # 01 Y:2002 | 01 | 2002 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $213,180 | $138,361 | Not Implemented |
MI0033 # 02 Y:2002 | 02 | 2002 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $7,472 | $8,890 | Not Implemented |
MI0033 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,230 | $117 | Implemented |
MI0033 # 04 Y:2002 | 04 | 2002 | METER WASTE WATER | $3,632 | $15 | Not Implemented |
MI0033 # 05 Y:2002 | 05 | 2002 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,816 | $60 | Not Implemented |
MS0204 # 01 Y:2002 | 01 | 2002 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $97,931 | $34,200 | Not Implemented |
MS0204 # 02 Y:2002 | 02 | 2002 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $10,266 | $5,760 | Not Implemented |
MS0204 # 03 Y:2002 | 03 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,500 | $3,763 | Not Implemented |
MS0204 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,399 | $331 | Not Implemented |
MS0204 # 05 Y:2002 | 05 | 2002 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $3,771 | $1,000 | Not Implemented |
MS0204 # 06 Y:2002 | 06 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $1,549 | $2,030 | Not Implemented |
MS0204 # 07 Y:2002 | 07 | 2002 | DISCONNECT BALLASTS | $129 | $256 | Implemented |
MS0204 # 08 Y:2002 | 08 | 2002 | PAY BILLS ON TIME TO AVOID LATE FEES | $89 | $25 | Implemented |
UF0290 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,693 | $20,165 | Not Implemented |
UF0290 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $35,297 | $71,595 | Not Implemented |
UF0290 # 03 Y:2002 | 03 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $864,295 | $3,600,000 | Not Implemented |
UF0290 # 04 Y:2002 | 04 | 2002 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $18,405 | $33,700 | Not Implemented |
UF0290 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,807 | $0 | Not Implemented |
UF0290 # 06 Y:2002 | 06 | 2002 | USE OPTIMUM TEMPERATURE | $234,181 | $2,080 | Not Implemented |
UF0290 # 07 Y:2002 | 07 | 2002 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $3,259 | $1,633 | Not Implemented |
UF0290 # 08 Y:2002 | 08 | 2002 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,947 | $2,300 | Not Implemented |
UF0290 # 09 Y:2002 | 09 | 2002 | USE TANKS WITH A CONICAL BOTTOM OUTLET SECTION TO REDUCE WASTE ASSOCIATED WITH THE INTERFACE OF TWO LIQUIDS | $17,094 | $0 | Not Implemented |