IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,028

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LT0036 # 03 Y:1985 03 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,373 $0 Implemented
LT0036 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $5,267 $350 Not Implemented
LT0036 # 05 Y:1985 05 1985 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $785 $354 Implemented
LT0036 # 06 Y:1985 06 1985 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,457 $1,840 Not Implemented
UD0173 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,989 $21,000 Implemented
UD0173 # 02 Y:1985 02 1985 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,721 $400 Implemented
UD0173 # 03 Y:1985 03 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $30,858 $1,000 Implemented
LT0030 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,893 $4,000 Implemented
LT0030 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,950 $0 Not Implemented
LT0030 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,165 $1,500 Not Implemented
LT0030 # 04 Y:1985 04 1985 COVER OPEN TANKS $11,697 $1,512 Not Implemented
LT0030 # 05 Y:1985 05 1985 INSULATE BARE EQUIPMENT $5,358 $8,532 Not Implemented
MA0028 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,972 $18,343 Not Implemented
MA0028 # 02 Y:1985 02 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,990 $3,525 Not Implemented
MA0028 # 03 Y:1985 03 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $218 $262 Not Implemented
MA0028 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,497 $94 Implemented
MA0028 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $606 $209 Not Implemented
GT0253 # 01 Y:1985 01 1985 REPAIR AND ELIMINATE STEAM LEAKS $3,190 $900 Implemented
GT0253 # 02 Y:1985 02 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $700 $1,100 Implemented
GT0253 # 03 Y:1985 03 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,860 $1,000 Implemented
GT0253 # 04 Y:1985 04 1985 KEEP BOILER TUBES CLEAN $3,230 $1,000 Not Implemented
GT0253 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $510 $0 Not Implemented
GT0253 # 06 Y:1985 06 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $957 $563 Implemented
GT0253 # 07 Y:1985 07 1985 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,017 $40,000 Not Implemented
ST0018 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,967 $2,258 Not Implemented