IAC logo
IAC Assessment: AT0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AT0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina A&T
Assessment Year 1986
Principal Product ALUMINUM PIPES (EXTRUDED)
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 54,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $350,643 7,740,915 kWh $0.05
Natural Gas $233,494 40,210 MMBtu $5.81
TOTAL ENERGY COSTS $584,137
RECOMMENDED SAVINGS* $71,779 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,419
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$834
Cost:
$859
$834 17,878 - - $834
17,878
kWh
-
-
MMBtu
02: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,360
Cost:
$1,700
$2,360 52,169 - - $2,360
52,169
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$948
Cost:
$2,250
$948 20,809 - - $948
20,809
kWh
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,830
Cost:
$1,640
- - $9,830 1,755 -
-
kWh
$9,830
1,755
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$11,108
Cost:
$14,000
$23,490 518,464 $(-12,382) (-2,211) $23,490
518,464
kWh
$(-12,382)
(-2,211)
MMBtu
06: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$46,699
Cost:
$227
$5,300 116,940 $41,399 7,393 $5,300
116,940
kWh
$41,399
7,393
MMBtu
TOTAL RECOMMENDED Savings:
$71,779
Cost:
$20,676
$32,932 726,260 $38,847 6,937 $32,932
726,260
kWh
$38,847
6,937
MMBtu
TOTAL IMPLEMENTED Savings:
$69,419
Cost:
$18,976
$30,572 674,091 $38,847 6,937 $30,572
674,091
kWh
$38,847
6,937
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas