IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0032 # 10 Y:1992 10 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,664 $930 Not Implemented
SD0032 # 06 Y:1992 06 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $138 $374 Not Implemented
SD0032 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $549 $3,710 Implemented
SD0032 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $5,950 $200 Implemented
SD0032 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $3,288 $1,510 Not Implemented
SD0032 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,038 $0 Implemented
SD0032 # 05 Y:1992 05 1992 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,219 $3,900 Not Implemented
SD0032 # 09 Y:1992 09 1992 KEEP LAMPS AND REFLECTORS CLEAN $2,987 $4,750 Not Implemented
SD0032 # 11 Y:1992 11 1992 INSTALL SET-BACK TIMERS $855 $818 Not Implemented
SD0032 # 07 Y:1992 07 1992 INSULATE BARE EQUIPMENT $68 $172 Not Implemented
SD0032 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,350 $1,020 Implemented
AS0071 # 08 Y:1992 08 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,921 $21,494 Not Implemented
AS0071 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,761 $5,217 Not Implemented
AS0071 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $15,532 $1,099 Not Implemented
AS0071 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,744 $2,500 Not Implemented
AS0071 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,487 $1,000 Not Implemented
AS0071 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,183 $4,100 Not Implemented
AS0071 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $762 $0 Not Implemented
AS0071 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,838 $28,119 Not Implemented
MA0252 # 07 Y:1992 07 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $969 $3,289 Not Implemented
MA0252 # 06 Y:1992 06 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,254 $600 Implemented
MA0252 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $8,460 $4,239 Not Implemented
MA0252 # 03 Y:1992 03 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $17,456 $55,777 Not Implemented
MA0252 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,026 $33,800 Not Implemented
MA0252 # 01 Y:1992 01 1992 BURN A LESS EXPENSIVE GRADE OF FUEL $152,380 $100,000 Implemented