Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0032
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1992
Principal Product EXTRUDED AL. HEAT SINKS
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $5,000,000-$10,000,000
# of Employees 94
Plant Area (Sq.Ft.) 0
Annual Production 1,500,000 Pieces
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,218 853,751 kWh $0.12
Natural Gas $20,957 3,128 MMBtu $6.70
TOTAL ENERGY COSTS $126,175
RECOMMENDED SAVINGS* $24,106 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,887
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$549
Cost:
$3,710
$549 4,396 - - - - $549
4,396
kWh
-
-
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,950
Cost:
$200
$4,603 37,222 $1,347 201 - - $4,603
37,222
kWh
$1,347
201
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,288
Cost:
$1,510
- - $3,288 491 - - -
-
kWh
$3,288
491
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,038
Cost:
-
- - $2,038 304 - - -
-
kWh
$2,038
304
MMBtu
-
-
$
05: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$5,219
Cost:
$3,900
- - $5,219 779 - - -
-
kWh
$5,219
779
MMBtu
-
-
$
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$138
Cost:
$374
- - $138 21 - - -
-
kWh
$138
21
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$68
Cost:
$172
- - $68 10 - - -
-
kWh
$68
10
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,350
Cost:
$1,020
$1,543 12,603 - - $(-193) - $1,543
12,603
kWh
-
-
MMBtu
$(-193)
-
$
09: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$2,987
Cost:
$4,750
$2,698 21,981 - - $289 - $2,698
21,981
kWh
-
-
MMBtu
$289
-
$
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,664
Cost:
$930
$1,443 11,723 - - $221 - $1,443
11,723
kWh
-
-
MMBtu
$221
-
$
11: 2.6232 INSTALL SET-BACK TIMERS Savings:
$855
Cost:
$818
$775 6,155 - - $80 - $775
6,155
kWh
-
-
MMBtu
$80
-
$
TOTAL RECOMMENDED Savings:
$24,106
Cost:
$17,384
$11,611 94,080 $12,098 1,806 $397 - $11,611
94,080
kWh
$12,098
1,806
MMBtu
$397
-
$
TOTAL IMPLEMENTED Savings:
$9,887
Cost:
$4,930
$6,695 54,221 $3,385 505 $(-193) - $6,695
54,221
kWh
$3,385
505
MMBtu
$(-193)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes