Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
787
matching recommendationsSIC | 3354 | Aluminum Extruded Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0068 # 03 Y:2025 | 03 | 2025 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $829 | $473 | n/a |
MU0068 # 06 Y:2025 | 06 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $529 | $0 | n/a |
MU0068 # 01 Y:2025 | 01 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $73,104 | $121,444 | n/a |
MU0068 # 02 Y:2025 | 02 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,526 | $9,755 | n/a |
MU0068 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $972 | $26 | n/a |
MU0068 # 10 Y:2025 | 10 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,486 | $80,718 | n/a |
MU0068 # 12 Y:2025 | 12 | 2025 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $728 | $22,678 | n/a |
MU0068 # 13 Y:2025 | 13 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,362 | $24,413 | n/a |
MU0068 # 07 Y:2025 | 07 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,415 | $0 | n/a |
MU0068 # 11 Y:2025 | 11 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $31 | $57 | n/a |
MU0068 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $1,137 | $2,018 | n/a |
MU0068 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $585 | $3,626 | n/a |
MU0068 # 09 Y:2025 | 09 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $393 | $0 | n/a |
MI0455 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $24,930 | $3,200 | n/a |
MI0455 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $46,100 | $45,007 | n/a |
MI0455 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,861 | $35,685 | n/a |
MI0455 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,287 | $1,620 | n/a |
MI0455 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,478 | $80 | n/a |
MI0455 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,323 | $1,578 | n/a |
NT0026 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,160 | $5,609 | Implemented |
NT0026 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,341 | $0 | Implemented |
NT0026 # 05 Y:2024 | 05 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $133,205 | $0 | Not Implemented |
NT0026 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $122,072 | $90,330 | Not Implemented |
NT0026 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $109,656 | $54,987 | Implemented |
GT0967 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $23,763 | $800 | Implemented |