IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 3356 Nonferrous Rolling And Drawing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0259 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,350 $730 Not Implemented
IC0259 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,393 $953 Not Implemented
IC0259 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,107 $15,295 Not Implemented
IC0259 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $914 $50 Not Implemented
LE0356 # 12 Y:2013 12 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,638 $1,086 Implemented
LE0356 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,343 $1,000 Not Implemented
LE0356 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,451 $520 Not Implemented
LE0356 # 05 Y:2013 05 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $756 $0 Implemented
LE0356 # 03 Y:2013 03 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,894 $51,200 Not Implemented
LE0356 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,126 $3,215 Implemented
LE0356 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,905 $5,175 Implemented
LE0356 # 04 Y:2013 04 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $146 $338 Not Implemented
LE0356 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,399 $3,700 Implemented
LE0356 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,139 $1,500 Not Implemented
LE0356 # 11 Y:2013 11 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,608 $25,060 Not Implemented
LE0356 # 09 Y:2013 09 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,341 $0 Implemented
AM0622 # 08 Y:2012 08 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,300 $0 Not Implemented
AM0622 # 09 Y:2012 09 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $560 $0 Implemented
AM0622 # 10 Y:2012 10 2012 USE SYNTHETIC LUBRICANT $550 $0 Not Implemented
AM0622 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,780 $870 Implemented
AM0622 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,900 $500 Not Implemented
AM0622 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,770 $55 Not Implemented
AM0622 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,720 $520 Implemented
AM0622 # 02 Y:2012 02 2012 MINIMIZE WATER USAGE $42,000 $7,000 Not Implemented
AM0622 # 01 Y:2012 01 2012 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $80,000 $240,000 Not Implemented