Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 3356 | Nonferrous Rolling And Drawing, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0622 # 02 Y:2012 | 02 | 2012 | MINIMIZE WATER USAGE | $42,000 | $7,000 | Not Implemented |
AM0622 # 10 Y:2012 | 10 | 2012 | USE SYNTHETIC LUBRICANT | $550 | $0 | Not Implemented |
AM0622 # 09 Y:2012 | 09 | 2012 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $560 | $0 | Implemented |
AM0622 # 08 Y:2012 | 08 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,300 | $0 | Not Implemented |
AM0622 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,780 | $870 | Implemented |
AM0622 # 06 Y:2012 | 06 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,900 | $500 | Not Implemented |
AM0622 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,770 | $55 | Not Implemented |
AM0622 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,720 | $520 | Implemented |
AM0622 # 03 Y:2012 | 03 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $25,450 | $69,300 | Implemented |
AM0622 # 01 Y:2012 | 01 | 2012 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $80,000 | $240,000 | Not Implemented |
LL0288 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $36,904 | $5,110 | Implemented |
LL0288 # 02 Y:2008 | 02 | 2008 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $18,692 | $24,500 | Not Implemented |
LL0288 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,639 | $840 | Implemented |
LL0288 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $3,002 | $1,635 | Implemented |
LL0288 # 05 Y:2008 | 05 | 2008 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,043 | $1,588 | Not Implemented |
LL0288 # 06 Y:2008 | 06 | 2008 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,244 | $1,402 | Not Implemented |
LL0288 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $997 | $630 | Not Implemented |
LL0288 # 08 Y:2008 | 08 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $457 | $218 | Not Implemented |