Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisiana, Lafayette |
---|---|
Assessment Year | 2008 |
Principal Product | Titanium Tubing |
NAICS | 335929 - Other Communication and Energy Wire Manufacturing |
SIC | 3356 - Nonferrous Rolling And Drawing, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 145,000 |
Annual Production | 4,000 Thousand Feet |
Production Hrs. Annual | 8,400 |
Location (State) | LA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $849,253 | 10,410,649 | kWh | $0.08 |
Electricity Fees | $27,336 | - | $ | - |
Natural Gas | $403,917 | 53,035 | MMBtu | $7.62 |
TOTAL ENERGY COSTS | $1,280,506 | |||
RECOMMENDED SAVINGS* | $66,978 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $43,545 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $36,904 Cost: $5,110 |
- | - | - | - | $36,904 | 4,843 | - | - |
- - kWh |
- - $ |
$36,904 4,843 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $18,692 Cost: $24,500 |
- | - | - | - | $18,692 | 2,453 | - | - |
- - kWh |
- - $ |
$18,692 2,453 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,639 Cost: $840 |
$3,523 | 44,237 | $116 | - | - | - | - | - |
$3,523 44,237 kWh |
$116 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $3,002 Cost: $1,635 |
- | - | - | - | $3,002 | 394 | - | - |
- - kWh |
- - $ |
$3,002 394 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,043 Cost: $1,588 |
$1,978 | 24,837 | $65 | - | - | - | - | - |
$1,978 24,837 kWh |
$65 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $1,244 Cost: $1,402 |
$1,204 | 15,120 | $40 | - | - | - | - | - |
$1,204 15,120 kWh |
$40 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $997 Cost: $630 |
$458 | 5,746 | $15 | - | - | - | $524 | - |
$458 5,746 kWh |
$15 - $ |
- - MMBtu |
$524 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $457 Cost: $218 |
$442 | 5,544 | $15 | - | - | - | - | - |
$442 5,544 kWh |
$15 - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $66,978 Cost: $35,923 |
$7,605 | 95,484 | $251 | - | $58,598 | 7,690 | $524 | - | $7,605 95,484 kWh |
$251 - $ |
$58,598 7,690 MMBtu |
$524 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $43,545 Cost: $7,585 |
$3,523 | 44,237 | $116 | - | $39,906 | 5,237 | - | - | $3,523 44,237 kWh |
$116 - $ |
$39,906 5,237 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Personnel Changes |