IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3357 Nonferrous Wiredrawing & Insulating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0149 # 14 Y:1984 14 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $834 $1,300 Not Implemented
KU0149 # 27 Y:1984 27 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,258 $906 Not Implemented
KU0149 # 26 Y:1984 26 1984 REPAIR AND ELIMINATE STEAM LEAKS $276 $300 Implemented
KU0149 # 25 Y:1984 25 1984 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,579 $500 Implemented
KU0149 # 24 Y:1984 24 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $486 $0 Implemented
KU0149 # 23 Y:1984 23 1984 INSTALL AUTOMATIC STACK DAMPER $4,551 $1,425 Implemented
KU0149 # 21 Y:1984 21 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $278 $0 Implemented
KU0149 # 20 Y:1984 20 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $550 Implemented
KU0149 # 19 Y:1984 19 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $131 $0 Not Implemented
KU0149 # 18 Y:1984 18 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $121 $0 Not Implemented
KU0149 # 17 Y:1984 17 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $534 $0 Not Implemented
KU0149 # 16 Y:1984 16 1984 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $3,367 $30 Implemented
KU0149 # 15 Y:1984 15 1984 INSULATE BARE EQUIPMENT $834 $40 Not Implemented
KU0149 # 01 Y:1984 01 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $34,443 $3,262 Implemented
KU0149 # 13 Y:1984 13 1984 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $911 $820 Implemented
KU0149 # 12 Y:1984 12 1984 REPAIR AND ELIMINATE STEAM LEAKS $125 $20 Implemented
KU0149 # 11 Y:1984 11 1984 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $339 $350 Not Implemented
KU0149 # 10 Y:1984 10 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $586 $300 Implemented
KU0149 # 09 Y:1984 09 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,551 $300 Implemented
KU0149 # 08 Y:1984 08 1984 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,626 $700 Not Implemented
KU0149 # 06 Y:1984 06 1984 INSULATE BARE EQUIPMENT $480 $325 Not Implemented
KU0149 # 05 Y:1984 05 1984 INSULATE BARE EQUIPMENT $666 $350 Not Implemented
KU0149 # 04 Y:1984 04 1984 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,550 $75 Not Implemented
KU0149 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $965 $400 Implemented
KU0149 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $3,920 $350 Implemented