Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,412
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0536 # 07 Y:2023 | 07 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $7,221 | $21,000 | n/a |
SU0536 # 08 Y:2023 | 08 | 2023 | INSTALL OCCUPANCY SENSORS | $122 | $468 | n/a |
TT0296 # 11 Y:2023 | 11 | 2023 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $2,853 | $7,500 | Not Implemented |
TT0296 # 10 Y:2023 | 10 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $203,680 | $300,000 | Not Implemented |
TT0296 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,690 | $8,100 | Implemented |
TT0296 # 08 Y:2023 | 08 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,078 | $4,500 | Not Implemented |
TT0296 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $41,037 | $32,500 | Not Implemented |
TT0296 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $81,000 | $60,000 | Implemented |
TT0296 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,264 | $1,920 | Implemented |
TT0296 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $22,207 | $1,640 | Implemented |
TT0296 # 03 Y:2023 | 03 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $200,000 | $10,000 | Not Implemented |
TT0296 # 02 Y:2023 | 02 | 2023 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $66,640 | $2,000 | Not Implemented |
TT0296 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,069 | $270 | Not Implemented |
UF0595 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,368 | $289,896 | Not Implemented |
UF0595 # 02 Y:2023 | 02 | 2023 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $39,683 | $20,785 | Implemented |
UF0595 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,931 | $25,400 | Implemented |
UF0595 # 10 Y:2023 | 10 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $20,697 | $4,480 | Implemented |
UF0595 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $1,092 | $2,160 | Implemented |
UF0595 # 08 Y:2023 | 08 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,317 | $5,838 | Implemented |
UF0595 # 04 Y:2023 | 04 | 2023 | USER BATTERY STORAGE FOR POWER QUALITY ISSUES | $6,261 | $20,000 | Not Implemented |
UF0595 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,458 | $356 | Implemented |
UF0595 # 06 Y:2023 | 06 | 2023 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,957 | $3,276 | Implemented |
UF0595 # 07 Y:2023 | 07 | 2023 | INSTALL SUB-METERING EQUIPMENT | $1,589 | $4,340 | Implemented |
SD0632 # 10 Y:2023 | 10 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $741 | $3,554 | Not Implemented |
SD0632 # 09 Y:2023 | 09 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $27,630 | $115,136 | Not Implemented |