Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,412
matching recommendationsSIC | 336 | Nonferrous Foundries (castings) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0281 # 01 Y:2001 | 01 | 2001 | UPGRADE OBSOLETE EQUIPMENT | $1,996,394 | $28,500 | Not Implemented |
IA0281 # 02 Y:2001 | 02 | 2001 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $38,729 | $1,405 | Not Implemented |
IA0281 # 03 Y:2001 | 03 | 2001 | USE POWER DURING OFF-PEAK PERIODS | $8,860 | $0 | Not Implemented |
IA0281 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,217 | $1,280 | Not Implemented |
IA0281 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,253 | $1,301 | Implemented |
IA0281 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,547 | $27 | Not Implemented |
IA0281 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,408 | $0 | Implemented |
IA0281 # 08 Y:2001 | 08 | 2001 | INSTALL OCCUPANCY SENSORS | $812 | $1,460 | Not Implemented |
SU0122 # 01 Y:2001 | 01 | 2001 | USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING | $18,489 | $0 | Not Implemented |
SU0122 # 02 Y:2001 | 02 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,468 | $0 | Not Implemented |
SU0122 # 03 Y:2001 | 03 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $486 | $0 | Not Implemented |
SU0122 # 04 Y:2001 | 04 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $15,879 | $0 | Not Implemented |
SU0122 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $38 | $0 | Not Implemented |
UM0193 # 01 Y:2001 | 01 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,099 | $12,877 | Not Implemented |
UM0193 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,550 | $3,000 | Implemented |
UM0193 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,556 | $675 | Implemented |
UM0193 # 04 Y:2001 | 04 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,365 | $1,000 | Implemented |
UM0193 # 05 Y:2001 | 05 | 2001 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $487 | $1,000 | Not Implemented |
UM0193 # 06 Y:2001 | 06 | 2001 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $341 | $200 | Implemented |
UM0193 # 07 Y:2001 | 07 | 2001 | USE RADIANT HEATER FOR SPOT HEATING | $942 | $4,500 | Not Implemented |
UM0193 # 08 Y:2001 | 08 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,160 | $2,060 | Not Implemented |
UM0193 # 09 Y:2001 | 09 | 2001 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $9,870 | $11,000 | Not Implemented |
UM0193 # 10 Y:2001 | 10 | 2001 | REDESIGN PROCESS | $40,150 | $2,500 | Implemented |
UM0193 # 11 Y:2001 | 11 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $27,400 | $1,000 | Implemented |
UM0193 # 12 Y:2001 | 12 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $26,010 | $1,650 | Not Implemented |