Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2001 |
Principal Product | cast aerospace parts |
NAICS | n/a |
SIC | 3363 - Aluminum Die-castings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 285,000 |
Annual Production | 1,800,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $325,754 | 12,384,400 | kWh | $0.03 |
Electricity Demand | $151,591 | 29,112 | kW-months/year | $5.21 |
Natural Gas | $360,342 | 53,680 | MMBtu | $6.71 |
TOTAL ENERGY COSTS | $869,397 | |||
RECOMMENDED SAVINGS* | $2,077,220 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $23,661 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Personnel Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $1,996,394 Cost: $28,500 |
$7,007 | 264,403 | $11,607 | 2,376 | $192,780 | - | $1,785,000 | - |
$7,007 264,403 kWh |
$11,607 2,376 kW-months/year |
$192,780 - $ |
$1,785,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $38,729 Cost: $1,405 |
$30,921 | 1,166,832 | $7,808 | 1,598 | - | - | - | - |
$30,921 1,166,832 kWh |
$7,808 1,598 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $8,860 Cost: - |
- | - | $8,860 | 600 | - | - | - | - |
- - kWh |
$8,860 600 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $5,217 Cost: $1,280 |
- | - | $5,217 | 1,068 | - | - | - | - |
- - kWh |
$5,217 1,068 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $18,253 Cost: $1,301 |
$14,572 | 549,879 | $3,681 | 754 | - | - | - | - |
$14,572 549,879 kWh |
$3,681 754 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,547 Cost: $27 |
$2,832 | 106,872 | $715 | 146 | - | - | - | - |
$2,832 106,872 kWh |
$715 146 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,408 Cost: - |
$4,319 | 162,963 | $1,089 | 223 | - | - | - | - |
$4,319 162,963 kWh |
$1,089 223 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $812 Cost: $1,460 |
$812 | 30,631 | - | - | - | - | - | - |
$812 30,631 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $2,077,220 Cost: $33,973 |
$60,463 | 2,281,580 | $38,977 | 6,765 | $192,780 | - | $1,785,000 | - | $60,463 2,281,580 kWh |
$38,977 6,765 kW-months/year |
$192,780 - $ |
$1,785,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $23,661 Cost: $1,301 |
$18,891 | 712,842 | $4,770 | 977 | - | - | - | - | $18,891 712,842 kWh |
$4,770 977 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Primary Product | Electricity Usage | Electricity Demand | Personnel Changes | Primary Product |