IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,106

matching recommendations
Reset
SIC 3363 Aluminum Die-castings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0154 # 07 Y:1993 07 1993 DISCONNECT BALLASTS $193 $200 Implemented
ND0154 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64 $120 Not Implemented
TN0490 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $8,220 $1,081 Not Implemented
TN0490 # 02 Y:1993 02 1993 ISOLATE HOT OR COLD EQUIPMENT $2,687 $7,200 Implemented
TN0490 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,097 $490 Implemented
TN0490 # 04 Y:1993 04 1993 INSTALL TIMERS AND/OR THERMOSTATS $746 $460 Implemented
TN0490 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $408 $277 Not Implemented
IA0045 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,690 $660 Implemented
IA0045 # 02 Y:1993 02 1993 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,118 $1,188 Not Implemented
IA0045 # 03 Y:1993 03 1993 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,196 $2,893 Implemented
IA0045 # 04 Y:1993 04 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,763 $714 Not Implemented
IA0045 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $2,302 $1,215 Not Implemented
RU0153 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $0 Not Implemented
RU0153 # 05 Y:1992 05 1992 IMPROVE LUBRICATION PRACTICES $4,228 $0 Not Implemented
RU0153 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,006 $0 Not Implemented
RU0153 # 07 Y:1992 07 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,172 $0 Not Implemented
RU0153 # 08 Y:1992 08 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,657 $2,500 Implemented
RU0153 # 09 Y:1992 09 1992 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $3,815 $0 Not Implemented
RU0153 # 01 Y:1992 01 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,182 $750 Implemented
RU0153 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $309 $0 Implemented
RU0153 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $865 $199 Implemented
MA0250 # 01 Y:1992 01 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $157,407 $100,000 Not Implemented
MA0250 # 02 Y:1992 02 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $39,404 $1,280 Implemented
MA0250 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,414 $25,738 Not Implemented
MA0250 # 04 Y:1992 04 1992 COVER OPEN TANKS $10,241 $2,000 Not Implemented