IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 3364 Nonferrous Die-casting Exc. Aluminum
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0122 # 04 Y:2001 04 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $15,879 $0 Not Implemented
SU0122 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $38 $0 Not Implemented
SD0277 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,030 $1,720 Implemented
SD0277 # 02 Y:2001 02 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,552 $100,000 Not Implemented
SD0277 # 03 Y:2001 03 2001 RECOVER WASTE HEAT FROM EQUIPMENT $11,030 $5,000 Not Implemented
SD0277 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $930 $3,000 Not Implemented
SD0277 # 05 Y:2001 05 2001 INSTALL SKYLIGHTS $12,773 $26,500 Not Implemented
SD0277 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,765 $4,674 Not Implemented
SD0277 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $3,648 $7,000 Implemented
SD0277 # 08 Y:2001 08 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,680 $6,000 Not Implemented
SD0277 # 09 Y:2001 09 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,947 $5,400 Not Implemented
SD0277 # 10 Y:2001 10 2001 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $12,060 $20,000 Not Implemented
SD0277 # 11 Y:2001 11 2001 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $2,383 $2,000 Implemented
SD0277 # 12 Y:2001 12 2001 MINIMIZE WATER USAGE $35,500 $15,000 Not Implemented
SD0277 # 13 Y:2001 13 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $337,800 $640,000 Not Implemented
SD0277 # 14 Y:2001 14 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $25,200 $25,000 Not Implemented
UM0137 # 01 Y:1999 01 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $420 $0 Implemented
UM0137 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,358 $40,000 Implemented
UM0137 # 03 Y:1999 03 1999 IMPROVE SPACE COMFORT CONDITIONING $4,047 $16,100 Implemented
UM0137 # 04 Y:1999 04 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $164,382 $400,000 Not Implemented
IA0129 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $28,568 $4,200 Implemented
IA0129 # 02 Y:1995 02 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $73 $0 Not Implemented
IA0129 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $961 $54 Implemented
IA0129 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $25 Implemented
IA0129 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $720 $317 Implemented