IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
Reset
SIC 3369 Nonferrous Foundries, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0595 # 08 Y:2023 08 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,317 $5,838 Implemented
UF0595 # 06 Y:2023 06 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,957 $3,276 Implemented
UF0595 # 07 Y:2023 07 2023 INSTALL SUB-METERING EQUIPMENT $1,589 $4,340 Implemented
UF0595 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $1,092 $2,160 Implemented
UF0595 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,931 $25,400 Implemented
UF0595 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $20,697 $4,480 Implemented
UF0595 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,458 $356 Implemented
UF0595 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $39,683 $20,785 Implemented
AM0834 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,792 $4,895 Implemented
AM0834 # 06 Y:2022 06 2022 PAY UTILITY BILLS ON TIME $267 $0 Implemented
AM0834 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $1,000 Implemented
AM0834 # 03 Y:2022 03 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,400 $500 Implemented
AM0834 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $363 $0 Implemented
AM0834 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $620 $410 Implemented
UF0508 # 09 Y:2017 09 2017 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,871 $700 Implemented
UF0508 # 03 Y:2017 03 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,931 $12,400 Implemented
UF0508 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,193 $2,737 Implemented
UF0508 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,114 $20,000 Implemented
UF0508 # 01 Y:2017 01 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,071 $44,637 Implemented
UF0508 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,564 $0 Implemented
UF0508 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,144 $1,169 Implemented
UF0508 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $1,548 $478 Implemented
UF0508 # 07 Y:2017 07 2017 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $3,384 $640 Implemented
LE0428 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,923 $1,000 Implemented
LE0428 # 06 Y:2017 06 2017 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,118 $10,500 Implemented