IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

587

matching recommendations
Reset
SIC 3398 Metal Heat Treating
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0372 # 09 Y:2010 09 2010 COVER OPEN TANKS $9,602 $2,472 Implemented
MA0665 # 01 Y:2010 01 2010 UPGRADE CONTROLS ON COMPRESSORS $15,680 $58,600 Implemented
MA0665 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,642 $18,330 Implemented
MA0665 # 03 Y:2010 03 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,625 $2,000 Not Implemented
MA0665 # 04 Y:2010 04 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,470 $200 Implemented
MA0665 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $1,134 $3,150 Not Implemented
MA0665 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,028 $480 Implemented
MA0665 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $155 $180 Implemented
TT0029 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,600 $12,000 Implemented
TT0029 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $52,700 $1,000 Implemented
TT0029 # 03 Y:2008 03 2008 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $7,050 $2,000 Not Implemented
TT0029 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $1,060 $250 Not Implemented
TT0029 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $1,250 $250 Not Implemented
TT0029 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,170 $2,000 Not Implemented
TT0029 # 07 Y:2008 07 2008 OPTIMIZE PLANT POWER FACTOR $4,855 $13,300 Implemented
AM0543 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $95,000 $175,000 Implemented
AM0543 # 02 Y:2008 02 2008 INSTALL SKYLIGHTS $3,050 $1,760 Not Implemented
AM0543 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $627 $0 Implemented
AM0543 # 04 Y:2008 04 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $205 $54 Implemented
AM0543 # 05 Y:2008 05 2008 SELL OIL TO RECYCLER $289 $837 Not Implemented
MA0625 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,463 $31,000 Not Implemented
MA0625 # 02 Y:2007 02 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,935 $8,000 Implemented
MA0625 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,861 $14,400 Not Implemented
MA0625 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,881 $0 Not Implemented
MA0625 # 05 Y:2007 05 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,964 $10,530 Implemented