IAC Assessment: BD0394
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0394
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2011
Principal Product Heat-treated parts
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 21,760
Annual Production 0 Units
Production Hrs. Annual 8,760
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,754 3,352,454 kWh $0.07
Electricity Demand $52,981 8,957 kW-months/year $5.92
Electricity Fees $9,605 - $ -
Natural Gas $153,186 29,450 MMBtu $5.20
TOTAL ENERGY COSTS $455,526
RECOMMENDED SAVINGS* $108,459 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,372
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$58,796
Cost:
$139,000
- - - - $58,796 11,307 -
-
kWh
-
-
kW-months/year
$58,796
11,307
MMBtu
02: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$35,291
Cost:
$9,000
- - - - $35,291 6,784 -
-
kWh
-
-
kW-months/year
$35,291
6,784
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,544
Cost:
$2,400
$5,878 82,210 $666 113 - - $5,878
82,210
kWh
$666
113
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,571
Cost:
$2,360
$3,208 44,863 $363 62 - - $3,208
44,863
kWh
$363
62
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,201
Cost:
$1,652
$1,978 27,666 $223 38 - - $1,978
27,666
kWh
$223
38
kW-months/year
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,201
Cost:
$400
$1,079 15,096 $122 21 - - $1,079
15,096
kWh
$122
21
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$855
Cost:
$225
$697 9,755 $158 27 - - $697
9,755
kWh
$158
27
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$108,459
Cost:
$155,037
$12,840 179,590 $1,532 261 $94,087 18,091 $12,840
179,590
kWh
$1,532
261
kW-months/year
$94,087
18,091
MMBtu
TOTAL IMPLEMENTED Savings:
$14,372
Cost:
$7,037
$12,840 179,590 $1,532 261 - - $12,840
179,590
kWh
$1,532
261
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas