Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 3398 | Metal Heat Treating |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0251 # 11 Y:2021 | 11 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,308 | $150 | Not Implemented |
TT0251 # 10 Y:2021 | 10 | 2021 | INSULATE BARE EQUIPMENT | $2,602 | $297 | Not Implemented |
TT0251 # 09 Y:2021 | 09 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,884 | $40 | Not Implemented |
TT0251 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,374 | $15,800 | Not Implemented |
TT0251 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,136 | $35,365 | Not Implemented |
TT0251 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,965 | $15,800 | Not Implemented |
TT0251 # 05 Y:2021 | 05 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $9,683 | $250 | Not Implemented |
TT0251 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,814 | $2,000 | Not Implemented |
TT0251 # 03 Y:2021 | 03 | 2021 | ADOPT IN-HOUSE MATERIAL GENERATION | $42,490 | $112,956 | Not Implemented |
TT0251 # 02 Y:2021 | 02 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $56,927 | $200 | Not Implemented |
TT0251 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $95,933 | $4,500 | Not Implemented |
TT0177 # 05 Y:2016 | 05 | 2016 | OPTIMIZE PLANT POWER FACTOR | $1,603 | $5,250 | Not Implemented |
TT0177 # 09 Y:2016 | 09 | 2016 | INSTALL TIMERS AND/OR THERMOSTATS | $108 | $23 | Not Implemented |
TT0177 # 08 Y:2016 | 08 | 2016 | USE COMPRESSOR AIR FILTERS | $338 | $75 | Implemented |
TT0177 # 07 Y:2016 | 07 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $663 | $150 | Implemented |
TT0177 # 06 Y:2016 | 06 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,002 | $1,400 | Implemented |
TT0177 # 04 Y:2016 | 04 | 2016 | INSULATE BARE EQUIPMENT | $2,669 | $1,720 | Not Implemented |
TT0177 # 03 Y:2016 | 03 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,803 | $500 | Not Implemented |
TT0177 # 02 Y:2016 | 02 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $6,467 | $250 | Not Implemented |
TT0177 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,244 | $15,800 | Not Implemented |
TT0029 # 07 Y:2008 | 07 | 2008 | OPTIMIZE PLANT POWER FACTOR | $4,855 | $13,300 | Implemented |
TT0029 # 06 Y:2008 | 06 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,170 | $2,000 | Not Implemented |
TT0029 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $1,250 | $250 | Not Implemented |
TT0029 # 04 Y:2008 | 04 | 2008 | INSULATE BARE EQUIPMENT | $1,060 | $250 | Not Implemented |
TT0029 # 03 Y:2008 | 03 | 2008 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $7,050 | $2,000 | Not Implemented |