Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
96
matching recommendationsSIC | 3399 | Primary Metal Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0306 # 04 Y:2010 | 04 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,549 | $1,800 | Not Implemented |
LE0306 # 03 Y:2010 | 03 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,691 | $10,000 | Not Implemented |
LE0306 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,392 | $12,700 | Not Implemented |
LE0306 # 01 Y:2010 | 01 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $75,618 | $68,000 | Not Implemented |
LE0274 # 03 Y:2008 | 03 | 2008 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,438 | $7,000 | Not Implemented |
LE0274 # 08 Y:2008 | 08 | 2008 | INSTALL OCCUPANCY SENSORS | $1,642 | $360 | Not Implemented |
LE0274 # 07 Y:2008 | 07 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,227 | $18,236 | Not Implemented |
LE0274 # 06 Y:2008 | 06 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $189 | $280 | Implemented |
LE0274 # 05 Y:2008 | 05 | 2008 | USE SYNTHETIC LUBRICANT | $1,064 | $500 | Implemented |
LE0274 # 04 Y:2008 | 04 | 2008 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $2,421 | $4,680 | Implemented |
LE0274 # 02 Y:2008 | 02 | 2008 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,058 | $10,000 | Not Implemented |
LE0274 # 01 Y:2008 | 01 | 2008 | INSTALL TIMERS AND/OR THERMOSTATS | $18,751 | $1,800 | Not Implemented |
LE0261 # 02 Y:2007 | 02 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $71,526 | $75,000 | Not Implemented |
LE0261 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,454 | $12,000 | Not Implemented |
LE0261 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,461 | $20 | Implemented |
LE0261 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,661 | $100 | Implemented |
LE0261 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,137 | $5,000 | Not Implemented |
LE0261 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,155 | $1,500 | Implemented |
LE0261 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,476 | $150 | Implemented |
LE0261 # 09 Y:2007 | 09 | 2007 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,985 | $300 | Not Implemented |
LE0261 # 01 Y:2007 | 01 | 2007 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $196,792 | $500 | Not Implemented |
SU0176 # 02 Y:2004 | 02 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $19,192 | $4,348 | Implemented |
SU0176 # 01 Y:2004 | 01 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $50 | $0 | Not Implemented |
SU0176 # 03 Y:2004 | 03 | 2004 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $2,160 | $939 | Implemented |
SU0176 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $934 | $434 | Implemented |