IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
SIC 3399 Primary Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0306 # 04 Y:2010 04 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,549 $1,800 Not Implemented
LE0306 # 03 Y:2010 03 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,691 $10,000 Not Implemented
LE0306 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,392 $12,700 Not Implemented
LE0306 # 01 Y:2010 01 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $75,618 $68,000 Not Implemented
LE0274 # 03 Y:2008 03 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,438 $7,000 Not Implemented
LE0274 # 08 Y:2008 08 2008 INSTALL OCCUPANCY SENSORS $1,642 $360 Not Implemented
LE0274 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,227 $18,236 Not Implemented
LE0274 # 06 Y:2008 06 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $189 $280 Implemented
LE0274 # 05 Y:2008 05 2008 USE SYNTHETIC LUBRICANT $1,064 $500 Implemented
LE0274 # 04 Y:2008 04 2008 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,421 $4,680 Implemented
LE0274 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,058 $10,000 Not Implemented
LE0274 # 01 Y:2008 01 2008 INSTALL TIMERS AND/OR THERMOSTATS $18,751 $1,800 Not Implemented
LE0261 # 02 Y:2007 02 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $71,526 $75,000 Not Implemented
LE0261 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,454 $12,000 Not Implemented
LE0261 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,461 $20 Implemented
LE0261 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,661 $100 Implemented
LE0261 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $7,137 $5,000 Not Implemented
LE0261 # 07 Y:2007 07 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,155 $1,500 Implemented
LE0261 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,476 $150 Implemented
LE0261 # 09 Y:2007 09 2007 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,985 $300 Not Implemented
LE0261 # 01 Y:2007 01 2007 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $196,792 $500 Not Implemented
SU0176 # 02 Y:2004 02 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $19,192 $4,348 Implemented
SU0176 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $50 $0 Not Implemented
SU0176 # 03 Y:2004 03 2004 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,160 $939 Implemented
SU0176 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $934 $434 Implemented