IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

447

matching recommendations
Reset
SIC 3399 Primary Metal Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1515 # 10 Y:2015 10 2015 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $838 $0 Implemented
UK1515 # 11 Y:2015 11 2015 ELIMINATE/REDUCE AN OPERATION $144,648 $0 Implemented
UK1515 # 12 Y:2015 12 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,162 $4,332 Not Implemented
UK1515 # 13 Y:2015 13 2015 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $976 $854 Implemented
UK1515 # 14 Y:2015 14 2015 REPAIR AND ELIMINATE STEAM LEAKS $10,160 $5,539 Implemented
DL0146 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $6,880 $1,000 Implemented
DL0146 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,520 $125,000 Not Implemented
DL0146 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $1,425 Not Implemented
DL0146 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $730 $100 Implemented
BS0053 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $220 $600 Not Implemented
BS0053 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $3,120 Not Implemented
BS0053 # 04 Y:2015 04 2015 COVER OPEN TANKS $44 $50 Not Implemented
BS0053 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $826 $968 Not Implemented
BS0053 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $879 $910 Not Implemented
BS0053 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,692 $15 Not Implemented
SF0460 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,062 $3,703 Implemented
SF0460 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,924 $9,629 Not Implemented
SF0460 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,269 $9,057 Not Implemented
SF0460 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,462 $9,228 Implemented
SF0460 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,945 $2,541 Not Implemented
SF0460 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,080 $4,429 Not Implemented
SF0460 # 02 Y:2015 02 2015 REPAIR AND ELIMINATE STEAM LEAKS $5,167 $624 Implemented
SF0460 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,832 $0 Not Implemented
SU0377 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $854 $514 Implemented
SU0377 # 02 Y:2015 02 2015 RECOVER AND REUSE WASTE MATERIAL $1,281,641 $1,000,000 Not Implemented